{"id":24,"date":"2024-06-01T09:00:00","date_gmt":"2024-06-01T09:00:00","guid":{"rendered":"https:\/\/altaintegra.com\/projects\/gbk-indoor\/"},"modified":"2026-08-24T17:05:49","modified_gmt":"2026-08-24T17:05:49","slug":"gelora-bung-karno-indoor-stadium","status":"publish","type":"project","link":"https:\/\/altaintegra.com\/th\/project\/gelora-bung-karno-indoor-stadium\/","title":{"rendered":"Indoor Multi-Purpose Stadium Gelora Bung Karno"},"content":{"rendered":"<p class=\"proj-p\">This is a public buildings and spaces project completed in 2023 in Jakarta, ID, part of ALTA Integra&#8217;s Acoustic Engineering and Audiovisual portfolio.<\/p>\n<div id=\"rank-math-toc\" class=\"wp-block-rank-math-toc-block\">\n<h2>Table of Contents<\/h2>\n<nav>\n<ul>\n<li><a href=\"#project-overview\">Project Overview<\/a><\/li>\n<li><a href=\"#project-scope\">Gelora Bung Karno Indoor Stadium, Engineering Scope<\/a><\/li>\n<li><a href=\"#project-details\">Gelora Bung Karno Indoor Stadium, Project Details<\/a><\/li>\n<li><a href=\"#related-work\">Related Gelora Bung Karno Indoor Stadium Work<\/a><\/li>\n<\/ul>\n<\/nav>\n<\/div>\n<h2 id=\"project-overview\" class=\"proj-h2\">Project Overview<\/h2>\n<p><!--alta-seo-block--><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/gbk-1-v2.jpg\" alt=\"Indoor Multi-Purpose Stadium Gelora Bung Karno, Gelora Bung Karno Indoor Stadium engineering by ALTA Integra\" loading=\"lazy\" title=\"\"><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/gbk-4.webp\" alt=\"Indoor Multi-Purpose Stadium Gelora Bung Karno, Gelora Bung Karno Indoor Stadium engineering by ALTA Integra (view 2)\" loading=\"lazy\" title=\"\"><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/gbk-2.png\" alt=\"Indoor Multi-Purpose Stadium Gelora Bung Karno, Gelora Bung Karno Indoor Stadium engineering by ALTA Integra (view 3)\" loading=\"lazy\" title=\"\"><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/gbk-3.jpg\" alt=\"Indoor Multi-Purpose Stadium Gelora Bung Karno, Gelora Bung Karno Indoor Stadium engineering by ALTA Integra (view 4)\" loading=\"lazy\" title=\"\"><br \/>\n<!--\/alta-seo-block--><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/gbk-4.webp\" alt=\"Gelora Bung Karno Indoor Stadium, Acoustic Engineering by ALTA Integra\" title=\"\"><\/p>\n<p class=\"proj-p\">The Indoor Multifunction Stadium (IMS) at Gelora Bung Karno was built as part of Indonesia&#8217;s preparation to co-host the FIBA Basketball World Cup 2023 with Japan and the Philippines, four tiers of stands under a space-frame roof, a main basketball court plus two practice courts, on a 30,720 m\u00b2 site. Beyond basketball, the venue&#8217;s program also covers volleyball, badminton, boxing, MMA, tennis, athletics, concerts, seminars, and other non-sport events, each placing different demands on the same enclosed room.<\/p>\n<p class=\"proj-p\">ALTA Integra was appointed acoustic design consultant from Basic Design through detailed design, working through a specific list of problems: noise breaking into the main court during rain, held to the standard required for both sports matches and music concerts; noise escaping the building during events; reverberation kept short enough that speech stays intelligible during matches, concerts, and fire-evacuation announcements; and acoustic quality in supporting spaces such as the press room, coaching rooms, and meeting rooms.<\/p>\n<p class=\"proj-p\">The room&#8217;s acoustic behaviour was modelled and auralised before construction, then checked against field measurements taken with a Class 1 acoustic measurement microphone: modelled reverberation time before treatment averaged roughly 8.6 seconds at low frequency, 6.1 seconds at mid, and 3.9 seconds at high, closely matched in the field, dropping to about 3.8, 3.3, and 2.1 seconds respectively once acoustic treatment was installed within the project&#8217;s budget, again confirmed on site.<\/p>\n<p class=\"proj-p\">The result met FIBA&#8217;s required acoustic performance without exceeding the allocated budget, coordinated throughout with the architecture team and the design-and-build contractor so the acoustic treatment integrated cleanly into the finished stands and roof.<\/p>\n<p class=\"proj-p\">Client: <a href=\"https:\/\/en.wikipedia.org\/wiki\/Gelora_Bung_Karno_Stadium\" target=\"_blank\" rel=\"noopener\">Aboday Architect<\/a>.<\/p>\n<h2 id=\"project-scope\" class=\"proj-h2\">Gelora Bung Karno Indoor Stadium, Engineering Scope<\/h2>\n<p class=\"proj-p\">ALTA Integra&#8217;s <a href=\"https:\/\/altaintegra.com\/services\/acoustic-consultant\/\">Acoustic Engineering<\/a> practice covers reverberation control, noise isolation, speech intelligibility, and room acoustic modelling, verified through on-site acoustic measurement. On a completed project, this typically means checking the finished space against the same targets used at the design stage, rather than treating acoustic modelling as a one-off design exercise.<\/p>\n<p class=\"proj-p\">The <a href=\"https:\/\/altaintegra.com\/services\/audiovisual-consultant\/\">Audiovisual<\/a> discipline covers sound reinforcement, video and display integration, and control-system design, coordinated alongside the acoustic and lighting scope. Equipment selection and signal routing are planned early enough that AV racks, cabling, and control points can be built into the architecture rather than retrofitted.<\/p>\n<p class=\"proj-p\">Gelora Bung Karno Indoor Stadium&#8217;s integration scope reflects ALTA Integra&#8217;s auditorium integration, coordinating acoustics, lighting, and AV for lecture, performance, and hybrid-event use in the same room.<\/p>\n<p class=\"proj-p\">As part of ALTA Integra&#8217;s Public Buildings and Spaces portfolio, Gelora Bung Karno Indoor Stadium sits among civic, cultural, and public-facing venues, where acoustics, lighting, and AV have to perform for large, varied audiences.<\/p>\n<p class=\"proj-p\">ALTA Integra&#8217;s process on Gelora Bung Karno Indoor Stadium followed its standard sequence: coordinating Acoustic Engineering and Audiovisual as a single scope rather than 2 separate hand-offs; modelling the relevant engineering criteria before construction, then verifying the finished result against those same targets on site.<\/p>\n<p class=\"proj-p\">Gelora Bung Karno Indoor Stadium falls within ALTA Integra&#8217;s Sport Stadium work, large-capacity venues where sound has to stay clear and controlled across every seating tier, for both sport and non-sport events.<\/p>\n<p class=\"proj-p\">Other Public Buildings and Spaces projects in ALTA Integra&#8217;s portfolio include <a href=\"https:\/\/altaintegra.com\/project\/kereta-misteri-dunia-fantasi-jakarta\/\">Kereta Misteri Dunia Fantasi Jakarta<\/a>, <a href=\"https:\/\/altaintegra.com\/project\/nice-pik2-convention-exhibition\/\">NICE PIK2 Convention Exhibition<\/a>.<\/p>\n<h2 id=\"project-details\" class=\"proj-h2\">Gelora Bung Karno Indoor Stadium, Project Details<\/h2>\n<p class=\"proj-p\">Before handover, ALTA Integra&#8217;s standard practice is to walk the finished space against the original design brief for Gelora Bung Karno Indoor Stadium, checking that installed equipment, room treatments, and control systems match what was specified, and flagging any adjustment needed before the space goes into daily use. This final verification step is treated as part of the project&#8217;s scope, not an optional add-on, since a design that only works on paper or in a simulation isn&#8217;t actually finished until it has been confirmed against the real, built result.<\/p>\n<p class=\"proj-p\">ALTA Integra documents every project like Gelora Bung Karno Indoor Stadium the same way: real measured or modelled targets, the actual disciplines and taxonomy under which the work is filed, and the people and organizations involved, kept consistent across the portfolio so any project can be compared against another on the same terms rather than described in one-off marketing language. That consistency matters more once a portfolio spans dozens of projects across different sectors, without a shared documentation standard, a client-facing case study and an internal engineering record would quietly drift into two different tellings of the same project.<\/p>\n<p class=\"proj-p\">Projects the size of Gelora Bung Karno Indoor Stadium also test how well a design holds up once it leaves the drawing board, a target reverberation time, an isolation figure, or a lighting level is only meaningful once it survives contact with the actual materials, contractors, and site conditions available on a real build, which is exactly why ALTA Integra treats the field-verification stage as equal in importance to the original design work rather than a formality that happens after the real work is done.<\/p>\n<p class=\"proj-p\">Every entry in ALTA Integra&#8217;s portfolio, including Gelora Bung Karno Indoor Stadium, is tagged against the same fixed taxonomy of portfolio category, subsector, engineering discipline, and, where relevant, strategic focus and integration type, rather than a free-text description that would vary from one project write-up to the next. That consistent tagging is what lets a visitor filter the portfolio by sector or discipline and get a meaningful, comparable result instead of a loosely related grab-bag of past work.<\/p>\n<p class=\"proj-p\">It was delivered with client Aboday Architect and owner Pusat Pengelolaan Komplek Gelora Bung Karno.<\/p>\n<p class=\"proj-p\">The project&#8217;s scope included engineering disciplines covering Acoustic Engineering and Audiovisual; integration scope across Auditoriums; strategic focus on Green Building.<\/p>\n<p class=\"proj-p\">It is located in Jakarta, ID, completed in 2023, classified under the Sport Stadium subsector and within ALTA Integra&#8217;s Public Buildings and Spaces portfolio category.<\/p>\n<p class=\"proj-p\">This case study documents ALTA Integra&#8217;s acoustic engineering approach for this project.<\/p>\n<p><!--alta-seo-block--><\/p>\n<h2 id=\"related-work\" class=\"proj-h2\">Related Gelora Bung Karno Indoor Stadium Work and Further Reading<\/h2>\n<p class=\"proj-p\">The Gelora Bung Karno Indoor Stadium work on this project connects directly to the engineering below, other ALTA Integra projects in the same sector, and the technical insights explaining the methods used here.<\/p>\n<ul class=\"proj-related\">\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/jakarta-international-stadium-1.jpg\" alt=\"Jakarta International Stadium, related Gelora Bung Karno Indoor Stadium work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Project:<\/strong> <a href=\"https:\/\/altaintegra.com\/project\/jakarta-international-stadium\/\">Jakarta International Stadium<\/a>, Multipurpose acoustics for sport, concert, and ceremony, a single venue tuned to host them all without rewiring.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/mandiri-plaza.jpg\" alt=\"Mandiri Plaza Hall, related Gelora Bung Karno Indoor Stadium work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Project:<\/strong> <a href=\"https:\/\/altaintegra.com\/project\/mandiri-plaza-hall\/\">Mandiri Plaza Hall<\/a>, Auditorium-grade integration inside a banking HQ, annual meetings, briefings, and concerts on the same rig.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/vihara-borobudur-medan-1.webp\" alt=\"Vihara Borobudur Medan, related Gelora Bung Karno Indoor Stadium work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Project:<\/strong> <a href=\"https:\/\/altaintegra.com\/project\/vihara-borobudur-medan\/\">Vihara Borobudur Medan<\/a>, Acoustic design that blends seamlessly with the unique sound signature of one of Indonesia&#8217;s largest temple complexes.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/2026\/07\/01_p_15359809782d6-jakarta-darurat-polusi-udara_jpg.webp\" alt=\"Indoor Air Quality in Jakarta Buildings: What LEED v5 and WELL v2 Require, related Gelora Bung Karno Indoor Stadium work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Insight:<\/strong> <a href=\"https:\/\/altaintegra.com\/insight\/indoor-air-quality-jakarta-leed-well\/\">Indoor Air Quality in Jakarta Buildings: What LEED v5 and WELL v2 Require<\/a>, ALTA Integra&#8217;s green building consultants explain how ventilation, filtration and certification protect indoor air from Jakarta&#8217;s persistent pollution.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/2026\/07\/01_mandiri-club-bank-mandiri_jpg.webp\" alt=\"EASE Acoustic Modelling for a Multi-Use Function Hall: The Mandiri Club Case Study, related Gelora Bung Karno Indoor Stadium work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Insight:<\/strong> <a href=\"https:\/\/altaintegra.com\/insight\/ease-acoustic-modelling-function-hall\/\">EASE Acoustic Modelling for a Multi-Use Function Hall: The Mandiri Club Case Study<\/a>, Five parameters modelled before construction, so the acoustic answer fitted the interior design instead of requiring it to be reworked.<\/li>\n<\/ul>\n<p><!--\/alta-seo-block--><\/p>\n","protected":false},"featured_media":1248,"template":"","portfolio":[42],"discipline":[28,37],"strategic":[96],"integration":[101],"subsector":[62],"class_list":["post-24","project","type-project","status-publish","has-post-thumbnail","hentry","portfolio-public-buildings-and-spaces","discipline-acoustic-consultant","discipline-audiovisual-consultant","strategic-green-building","integration-auditoriums","subsector-sport-stadium"],"acf":[],"_links":{"self":[{"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/projects\/24","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/types\/project"}],"version-history":[{"count":10,"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/projects\/24\/revisions"}],"predecessor-version":[{"id":2138,"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/projects\/24\/revisions\/2138"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/media\/1248"}],"wp:attachment":[{"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/media?parent=24"}],"wp:term":[{"taxonomy":"portfolio","embeddable":true,"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/portfolio?post=24"},{"taxonomy":"discipline","embeddable":true,"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/discipline?post=24"},{"taxonomy":"strategic","embeddable":true,"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/strategic?post=24"},{"taxonomy":"integration","embeddable":true,"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/integration?post=24"},{"taxonomy":"subsector","embeddable":true,"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/subsector?post=24"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}