{"id":273,"date":"2026-06-22T11:33:21","date_gmt":"2026-06-22T11:33:21","guid":{"rendered":"https:\/\/altaintegra.com\/projects\/infinite-batam\/"},"modified":"2026-08-24T17:05:38","modified_gmt":"2026-08-24T17:05:38","slug":"infinite-batam","status":"publish","type":"project","link":"https:\/\/altaintegra.com\/th\/project\/infinite-batam\/","title":{"rendered":"Infinite Movie Studio Batam"},"content":{"rendered":"<p class=\"proj-p\">This is a media production project completed in 2017 in Batam, ID, part of ALTA Integra&#8217;s Acoustic Engineering portfolio.<\/p>\n<div id=\"rank-math-toc\" class=\"wp-block-rank-math-toc-block\">\n<h2>Table of Contents<\/h2>\n<nav>\n<ul>\n<li><a href=\"#project-overview\">Project Overview<\/a><\/li>\n<li><a href=\"#project-scope\">Infinite Batam, Engineering Scope<\/a><\/li>\n<li><a href=\"#project-details\">Infinite Batam, Project Details<\/a><\/li>\n<li><a href=\"#related-work\">Related Infinite Work<\/a><\/li>\n<\/ul>\n<\/nav>\n<\/div>\n<h2 id=\"project-overview\" class=\"proj-h2\">Project Overview<\/h2>\n<p><!--alta-seo-block--><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/inifinite-batam.jpg\" alt=\"Infinite Movie Studio Batam, infinite engineering by ALTA Integra\" loading=\"lazy\" title=\"\"><br \/>\n<!--\/alta-seo-block--><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/inifinite-batam.jpg\" alt=\"Infinite Batam, Acoustic Engineering by ALTA Integra\" title=\"\"><\/p>\n<p class=\"proj-p\">Infinite Movie Studio in Nongsa, Batam is part of Infinite Studios&#8217; production complex, one of Southeast Asia&#8217;s largest film and animation facilities, working across international movie, television, and streaming productions. Delivered in 2017, the acoustic engineering scope had to serve a studio built to run several different production disciplines through the same rooms rather than a single fixed use.<\/p>\n<p class=\"proj-p\">ALTA Integra designed flexible acoustic envelopes able to move between movie production, music recording, foley work, and dubbing without retuning the space each time, the same studio serving different production needs on different days while holding to one neutral acoustic reference throughout. That scope covered both the studio&#8217;s recording and broadcast integration requirements, treating sound isolation, room acoustics, and reverberation control as a shared foundation across all four uses rather than designing each discipline&#8217;s space separately.<\/p>\n<p class=\"proj-p\">The result is a studio that stays acoustically consistent regardless of which production discipline is running on a given day, supporting Infinite Studios&#8217; capacity to serve a mix of movie, music, and post-production work from Batam for an international client base, within a facility also designed to green building standards.<\/p>\n<h2 id=\"project-scope\" class=\"proj-h2\">Infinite Batam, Engineering Scope<\/h2>\n<p class=\"proj-p\">ALTA Integra&#8217;s <a href=\"https:\/\/altaintegra.com\/services\/acoustic-consultant\/\">Acoustic Engineering<\/a> practice covers reverberation control, noise isolation, speech intelligibility, and room acoustic modelling, verified through on-site acoustic measurement. On a completed project, this typically means checking the finished space against the same targets used at the design stage, rather than treating acoustic modelling as a one-off design exercise.<\/p>\n<p class=\"proj-p\">Infinite Batam&#8217;s integration scope reflects ALTA Integra&#8217;s broadcast integration, where acoustic treatment and AV systems are built around live and recorded production requirements.<\/p>\n<p class=\"proj-p\">As part of ALTA Integra&#8217;s Media Production portfolio, Infinite Batam sits among studio and broadcast environments, where acoustic isolation and technical integration directly affect production quality.<\/p>\n<p class=\"proj-p\">ALTA Integra&#8217;s process on Infinite Batam followed its standard sequence: modelling the relevant engineering criteria before construction, then verifying the finished result against those same targets on site.<\/p>\n<p class=\"proj-p\">Infinite Batam falls within ALTA Integra&#8217;s Movie Studio work, production stages where acoustic isolation from the outside world is the baseline requirement, not an added feature.<\/p>\n<p class=\"proj-p\">Other Media Production projects in ALTA Integra&#8217;s portfolio include <a href=\"https:\/\/altaintegra.com\/project\/mancave-music-billiard-game-studio\/\">Mancave Music Billiard Game Studio<\/a>, <a href=\"https:\/\/altaintegra.com\/project\/karnaval-dangdut-thamrin\/\">Karnaval Dangdut Thamrin<\/a>.<\/p>\n<h2 id=\"project-details\" class=\"proj-h2\">Infinite Batam, Project Details<\/h2>\n<p class=\"proj-p\">Before handover, ALTA Integra&#8217;s standard practice is to walk the finished space against the original design brief for Infinite Batam, checking that installed equipment, room treatments, and control systems match what was specified, and flagging any adjustment needed before the space goes into daily use. This final verification step is treated as part of the project&#8217;s scope, not an optional add-on, since a design that only works on paper or in a simulation isn&#8217;t actually finished until it has been confirmed against the real, built result.<\/p>\n<p class=\"proj-p\">ALTA Integra documents every project like Infinite Batam the same way: real measured or modelled targets, the actual disciplines and taxonomy under which the work is filed, and the people and organizations involved, kept consistent across the portfolio so any project can be compared against another on the same terms rather than described in one-off marketing language. That consistency matters more once a portfolio spans dozens of projects across different sectors, without a shared documentation standard, a client-facing case study and an internal engineering record would quietly drift into two different tellings of the same project.<\/p>\n<p class=\"proj-p\">Projects the size of Infinite Batam also test how well a design holds up once it leaves the drawing board, a target reverberation time, an isolation figure, or a lighting level is only meaningful once it survives contact with the actual materials, contractors, and site conditions available on a real build, which is exactly why ALTA Integra treats the field-verification stage as equal in importance to the original design work rather than a formality that happens after the real work is done.<\/p>\n<p class=\"proj-p\">Every entry in ALTA Integra&#8217;s portfolio, including Infinite Batam, is tagged against the same fixed taxonomy of portfolio category, subsector, engineering discipline, and, where relevant, strategic focus and integration type, rather than a free-text description that would vary from one project write-up to the next. That consistent tagging is what lets a visitor filter the portfolio by sector or discipline and get a meaningful, comparable result instead of a loosely related grab-bag of past work.<\/p>\n<p class=\"proj-p\">It was delivered with client Infinite Studios.<\/p>\n<p class=\"proj-p\">The project&#8217;s scope included engineering disciplines covering Acoustic Engineering; integration scope across Broadcast and Recording Studio; strategic focus on Green Building.<\/p>\n<p class=\"proj-p\">It is located in Batam, ID, completed in 2017, classified under the Movie Studio subsector and within ALTA Integra&#8217;s Media Production portfolio category.<\/p>\n<p class=\"proj-p\">This case study documents ALTA Integra&#8217;s acoustic engineering approach for this project.<\/p>\n<p class=\"proj-p\">Infinite Studios&#8217; Batam production facility is documented on its <a href=\"https:\/\/www.infinitestudios.com.sg\/batam\" target=\"_blank\" rel=\"noopener\">official site<\/a>.<\/p>\n<p><!--alta-seo-block--><\/p>\n<h2 id=\"related-work\" class=\"proj-h2\">Related Infinite Work and Further Reading<\/h2>\n<p class=\"proj-p\">The Infinite work on this project connects directly to the engineering below, other ALTA Integra projects in the same sector, and the technical insights explaining the methods used here.<\/p>\n<ul class=\"proj-related\">\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/md-picture.jpg\" alt=\"MD Pictures Jakarta, related infinite work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Project:<\/strong> <a href=\"https:\/\/altaintegra.com\/project\/md-pictures\/\">MD Pictures Jakarta<\/a>, Total design for a national film studio, tracking, dubbing, foley, and post all from one acoustic master plan.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/nusantara-tv.png\" alt=\"Nusantara TV Tower, related infinite work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Project:<\/strong> <a href=\"https:\/\/altaintegra.com\/project\/nt-tower-jakarta\/\">Nusantara TV Tower<\/a>, Acoustic, lighting, and audiovisual design across the Nusantara TV Tower, daily news production, talk-shows, and live-to-air specials share the building with corporate offices, an auditorium, and\u2026<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/akasta-1.png\" alt=\"Akasta \/ Holywing Entertainment, related infinite work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Project:<\/strong> <a href=\"https:\/\/altaintegra.com\/project\/akasta-holywing-bali\/\">Akasta \/ Holywing Entertainment<\/a>, High-energy entertainment venue, sound isolation from adjacent spaces and a concert-grade PA tuned from intimate bar to full-capacity events.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/2026\/07\/01_batam-studio_jpg.webp\" alt=\"Sound Stage Acoustic Design: How Scoring Stages, Foley Rooms and ADR Studios Differ, related infinite work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Insight:<\/strong> <a href=\"https:\/\/altaintegra.com\/insight\/sound-stage-acoustic-design\/\">Sound Stage Acoustic Design: How Scoring Stages, Foley Rooms and ADR Studios Differ<\/a>, Four rooms in the same post-production building, four opposite acoustic targets, and one of them is trying to be as close to silent as construction allows.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/2026\/07\/01_gambar_2_jpg.webp\" alt=\"Music Studio Acoustic Design: Isolation, Treatment and RT60 Targets for Home and Commercial Rooms, related infinite work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Insight:<\/strong> <a href=\"https:\/\/altaintegra.com\/insight\/music-studio-acoustic-design\/\">Music Studio Acoustic Design: Isolation, Treatment and RT60 Targets for Home and Commercial Rooms<\/a>, Two problems that get confused constantly: keeping sound out of the room, and controlling what the room does to the sound already inside it.<\/li>\n<\/ul>\n<p><!--\/alta-seo-block--><\/p>\n","protected":false},"featured_media":1271,"template":"","portfolio":[46],"discipline":[28],"strategic":[96],"integration":[102,105],"subsector":[82],"class_list":["post-273","project","type-project","status-publish","has-post-thumbnail","hentry","portfolio-entertainment-and-media-production","discipline-acoustic-consultant","strategic-green-building","integration-broadcast","integration-recording-studio","subsector-movie-studio"],"acf":[],"_links":{"self":[{"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/projects\/273","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/types\/project"}],"version-history":[{"count":9,"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/projects\/273\/revisions"}],"predecessor-version":[{"id":2126,"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/projects\/273\/revisions\/2126"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/media\/1271"}],"wp:attachment":[{"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/media?parent=273"}],"wp:term":[{"taxonomy":"portfolio","embeddable":true,"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/portfolio?post=273"},{"taxonomy":"discipline","embeddable":true,"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/discipline?post=273"},{"taxonomy":"strategic","embeddable":true,"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/strategic?post=273"},{"taxonomy":"integration","embeddable":true,"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/integration?post=273"},{"taxonomy":"subsector","embeddable":true,"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/subsector?post=273"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}