{"id":29,"date":"2024-06-01T09:00:00","date_gmt":"2024-06-01T09:00:00","guid":{"rendered":"https:\/\/altaintegra.com\/projects\/jpmorgan-jkt\/"},"modified":"2026-09-02T03:21:47","modified_gmt":"2026-09-02T03:21:47","slug":"global-investment-bank-jakarta-office","status":"publish","type":"project","link":"https:\/\/altaintegra.com\/th\/project\/global-investment-bank-jakarta-office\/","title":{"rendered":"Global Investment Bank Head Office"},"content":{"rendered":"<p class=\"proj-p\">This Global Investment Bank Jakarta Office project is a corporate, education, and healthcare engagement completed in 2026 in Jakarta, ID, part of ALTA Integra\u2019s Acoustic Engineering, Green Building and Lighting Design portfolio.<\/p>\n<div id=\"rank-math-toc\" class=\"wp-block-rank-math-toc-block\">\n<h2>Table of Contents<\/h2>\n<nav>\n<ul>\n<li><a href=\"#project-overview\">Project Overview<\/a><\/li>\n<li><a href=\"#project-scope\">Global Investment Bank Head Office, Engineering Scope<\/a><\/li>\n<li><a href=\"#project-details\">Global Investment Bank Head Office, Project Details<\/a><\/li>\n<li><a href=\"#related-work\">Related Global Investment Bank Work<\/a><\/li>\n<\/ul>\n<\/nav>\n<\/div>\n<h2 id=\"project-overview\" class=\"proj-h2\">Project Overview<\/h2>\n<p><!--alta-seo-block--><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/jp-morgan-1-v2.jpg\" alt=\"Global Investment Bank Head Office, Global Investment Bank engineering by ALTA Integra\" title=\"\"><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/jp-morgan-2-v2.jpg\" alt=\"Global Investment Bank Head Office, Global Investment Bank engineering by ALTA Integra (view 2)\" title=\"\"><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/jp-morgan-3.jpg\" alt=\"Global Investment Bank Head Office, Global Investment Bank engineering by ALTA Integra (view 3)\" title=\"\"><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/jp-morgan-4.jpg\" alt=\"Global Investment Bank Head Office, Global Investment Bank engineering by ALTA Integra (view 4)\" title=\"\"><br \/>\n<!--\/alta-seo-block--><\/p>\n<p><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/jp-morgan-1-v2.jpg\" alt=\"Global Investment Bank Jakarta Office, Acoustic Engineering by ALTA Integra\" title=\"\"><\/p>\n<p class=\"proj-p\">This Jakarta office for a global investment bank was designed in 2026 with M Moser Associates, the international workplace design and architecture firm, covering conference halls within a corporate fit-out built to both LEED and WELL Certification targets. The brief paired two performance certifications that don&#8217;t always sit comfortably together, LEED&#8217;s energy and daylight metrics alongside WELL&#8217;s human-health criteria, inside a banking workplace that still has to read as calm and productive rather than clinical.<\/p>\n<p class=\"proj-p\">ALTA Integra&#8217;s scope spanned acoustic engineering, lighting design, and green building consulting, working alongside M Moser Associates on the daylight and acoustic performance of the space. Lighting was modelled through sDA (spatial Daylight Autonomy) and ASE (Annual Sunlight Exposure) analysis, balancing daylight harvesting against glare control, with artificial lighting layered in to maintain consistent illumination once natural light drops off through the day. Acoustic design was carried to LEED-grade standards, addressing speech privacy and background noise control across the conference and meeting spaces central to a bank&#8217;s daily operations.<\/p>\n<p class=\"proj-p\">Taken together, the aim was a workplace that meets the measurable targets both certifications set, daylight autonomy, glare exposure, reverberation and noise criteria, without the sterile, over-lit character that a purely metrics-driven fit-out can produce, keeping the space functional for its investment-banking tenants without feeling institutional.<\/p>\n<h2 id=\"project-scope\" class=\"proj-h2\">Global Investment Bank Jakarta Office, Engineering Scope<\/h2>\n<p class=\"proj-p\">ALTA Integra\u2019s <a href=\"https:\/\/altaintegra.com\/services\/acoustic-consultant\/\">Acoustic Engineering<\/a> practice covers reverberation control, noise isolation, speech intelligibility, and room acoustic modelling, verified through on-site acoustic measurement. On a completed project, this typically means checking the finished space against the same targets used at the design stage, rather than treating acoustic modelling as a one-off design exercise.<\/p>\n<p class=\"proj-p\">The <a href=\"https:\/\/altaintegra.com\/services\/green-building-certification\/\">Green Building<\/a> discipline supports certification pathways such as LEED and EDGE, covering energy performance, materials, and indoor environmental quality. Certification documentation is prepared alongside the design process itself, so compliance evidence exists from the outset rather than being reconstructed after construction.<\/p>\n<p class=\"proj-p\"><a href=\"https:\/\/altaintegra.com\/services\/lighting-designer\/\">Lighting Design<\/a> work covers illuminance levels, colour temperature, and light layering, balancing visual comfort with the space\u2019s architectural character. Fixture selection and control zoning are worked out alongside the electrical and interior design teams so the finished lighting reads as one coherent layer, not a collection of separate fittings.<\/p>\n<p class=\"proj-p\">Global Investment Bank Jakarta Office\u2019s integration scope reflects ALTA Integra\u2019s conference hall integration, covering AV, acoustics, and lighting for presentation and hybrid-meeting use.<\/p>\n<p class=\"proj-p\">As part of ALTA Integra\u2019s Corporate, Education, and Healthcare portfolio, Global Investment Bank Jakarta Office sits among workplace, learning, and clinical environments, where comfort and speech clarity are day-to-day performance requirements, not one-off events.<\/p>\n<p class=\"proj-p\">ALTA Integra\u2019s process on Global Investment Bank Jakarta Office followed its standard sequence: coordinating Acoustic Engineering, Green Building and Lighting Design as a single scope rather than 3 separate hand-offs; modelling the relevant engineering criteria before construction, then verifying the finished result against those same targets on site.<\/p>\n<p class=\"proj-p\">Global Investment Bank Jakarta Office falls within ALTA Integra\u2019s Office &amp;amp; Fit-Out work, workplace interiors where the engineering scope has to integrate cleanly into a finished, occupied fit-out.<\/p>\n<p class=\"proj-p\">Other Corporate, Education, and Healthcare projects in ALTA Integra\u2019s portfolio include <a href=\"https:\/\/altaintegra.com\/project\/santo-ignatius-building-canisius-college\/\">Santo Ignatius Building Canisius College<\/a>, <a href=\"https:\/\/altaintegra.com\/project\/audiovisual-room-canisius-college\/\">Audiovisual Room Canisius College<\/a>.<\/p>\n<h2 id=\"project-details\" class=\"proj-h2\">Global Investment Bank Jakarta Office, Project Details<\/h2>\n<p class=\"proj-p\">Before handover, ALTA Integra\u2019s standard practice is to walk the finished space against the original design brief for Global Investment Bank Jakarta Office, checking that installed equipment, room treatments, and control systems match what was specified, and flagging any adjustment needed before the space goes into daily use. This final verification step is treated as part of the project\u2019s scope, not an optional add-on, since a design that only works on paper or in a simulation isn\u2019t actually finished until it has been confirmed against the real, built result.<\/p>\n<p class=\"proj-p\">ALTA Integra documents every project like Global Investment Bank Jakarta Office the same way: real measured or modelled targets, the actual disciplines and taxonomy under which the work is filed, and the people and organizations involved, kept consistent across the portfolio so any project can be compared against another on the same terms rather than described in one-off marketing language. That consistency matters more once a portfolio spans dozens of projects across different sectors, without a shared documentation standard, a client-facing case study and an internal engineering record would quietly drift into two different tellings of the same project.<\/p>\n<p class=\"proj-p\">Projects the size of Global Investment Bank Jakarta Office also test how well a design holds up once it leaves the drawing board, a target reverberation time, an isolation figure, or a lighting level is only meaningful once it survives contact with the actual materials, contractors, and site conditions available on a real build, which is exactly why ALTA Integra treats the field-verification stage as equal in importance to the original design work rather than a formality that happens after the real work is done.<\/p>\n<p class=\"proj-p\">Every entry in ALTA Integra\u2019s portfolio, including Global Investment Bank Jakarta Office, is tagged against the same fixed taxonomy of portfolio category, subsector, engineering discipline, and, where relevant, strategic focus and integration type, rather than a free-text description that would vary from one project write-up to the next. That consistent tagging is what lets a visitor filter the portfolio by sector or discipline and get a meaningful, comparable result instead of a loosely related grab-bag of past work.<\/p>\n<p class=\"proj-p\">It was delivered with client M Moser Associates and owner Global Investment Bank.<\/p>\n<p class=\"proj-p\">The project\u2019s scope included engineering disciplines covering Acoustic Engineering, Green Building and Lighting Design; integration scope across Conference Halls; strategic focus on LEED Consulting and WELL Certification.<\/p>\n<p class=\"proj-p\">It is located in Jakarta, ID, completed in 2026, classified under the Office &amp;amp; Fit-Out subsector and within ALTA Integra\u2019s Corporate, Education, and Healthcare portfolio category.<\/p>\n<p class=\"proj-p\">This case study documents ALTA Integra\u2019s acoustic engineering approach for this project.<\/p>\n<p class=\"proj-p\">This project&#8217;s LEED-aligned acoustic and daylight approach follows criteria maintained by the <a href=\"https:\/\/www.usgbc.org\/leed\" target=\"_blank\" rel=\"noopener\">U.S. Green Building Council<\/a>.<\/p>\n<p><!--alta-seo-block--><\/p>\n<h2 id=\"related-work\" class=\"proj-h2\">Related Global Investment Bank Work and Further Reading<\/h2>\n<p class=\"proj-p\">The Global Investment Bank work on this project connects directly to the engineering below, other ALTA Integra projects in the same sector, and the technical insights explaining the methods used here.<\/p>\n<ul class=\"proj-related\">\n<li><strong>Project:<\/strong> <a href=\"https:\/\/altaintegra.com\/project\/digital-entertainment-head-office-jakarta\/\">Global Digital Entertainment Head Office<\/a>, Listening rooms and focus pods tuned for critical playback, every workstation a viable reference position.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/bank-of-america.jpg\" alt=\"Global Financial Services Office, related Global Investment Bank work by ALTA Integra\" title=\"\"> <strong>Project:<\/strong> <a href=\"https:\/\/altaintegra.com\/project\/global-financial-services-office-jakarta\/\">Global Financial Services Office<\/a>, Global banking fitout, open-plan acoustic zoning, hybrid-ready meeting rooms, and biophilic lighting for a workforce focused on precision.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/bytedance-1.jpg\" alt=\"Global Digital Platform Jakarta MCC Building, related Global Investment Bank work by ALTA Integra\" title=\"\"> <strong>Project:<\/strong> <a href=\"https:\/\/altaintegra.com\/project\/global-digital-platform-mcc\/\">Global Digital Platform Jakarta MCC Building<\/a>, Online and offline group meeting modes with and without a presenter, every wall and microphone calibrated for both.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/2026\/07\/01_Kolaborasi_ALTA_Integra_jpg.webp\" alt=\"Green Building Certification Consultant Indonesia, related Global Investment Bank work by ALTA Integra\" title=\"\"> <strong>Insight:<\/strong> <a href=\"https:\/\/altaintegra.com\/insight\/green-building-certification-consultant\/\">Green Building Certification Consultant Indonesia<\/a>, ALTA Integra provides green building certification consulting for Greenship, EDGE, BGH, and LEED, integrating design with project management.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/2026\/07\/01_p_15359809782d6-jakarta-darurat-polusi-udara_jpg.webp\" alt=\"Indoor Air Quality in Jakarta Buildings: What LEED v5 and WELL v2 Require, related Global Investment Bank work by ALTA Integra\" title=\"\"> <strong>Insight:<\/strong> <a href=\"https:\/\/altaintegra.com\/insight\/indoor-air-quality-jakarta-leed-well\/\">Indoor Air Quality in Jakarta Buildings: What LEED v5 and WELL v2 Require<\/a>, ALTA Integra&#8217;s green building consultants explain how ventilation, filtration and certification protect indoor air from Jakarta&#8217;s persistent pollution.<\/li>\n<\/ul>\n<p><!--\/alta-seo-block--><\/p>\n","protected":false},"featured_media":1275,"template":"","portfolio":[44],"discipline":[28,39,30],"strategic":[98,97],"integration":[104],"subsector":[69],"class_list":["post-29","project","type-project","status-publish","has-post-thumbnail","hentry","portfolio-corporate-education-and-healthcare","discipline-acoustic-consultant","discipline-green-building-certification","discipline-lighting-designer","strategic-leed-consulting","strategic-well-certification","integration-conference-halls","subsector-office-fit-out"],"acf":[],"_links":{"self":[{"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/projects\/29","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/types\/project"}],"version-history":[{"count":15,"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/projects\/29\/revisions"}],"predecessor-version":[{"id":2392,"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/projects\/29\/revisions\/2392"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/media\/1275"}],"wp:attachment":[{"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/media?parent=29"}],"wp:term":[{"taxonomy":"portfolio","embeddable":true,"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/portfolio?post=29"},{"taxonomy":"discipline","embeddable":true,"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/discipline?post=29"},{"taxonomy":"strategic","embeddable":true,"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/strategic?post=29"},{"taxonomy":"integration","embeddable":true,"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/integration?post=29"},{"taxonomy":"subsector","embeddable":true,"href":"https:\/\/altaintegra.com\/th\/wp-json\/wp\/v2\/subsector?post=29"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}