{"id":2694,"date":"2026-10-26T10:23:10","date_gmt":"2026-10-26T10:23:10","guid":{"rendered":"https:\/\/altaintegra.com\/?post_type=insight&#038;p=2694"},"modified":"2026-11-17T09:51:27","modified_gmt":"2026-11-17T09:51:27","slug":"sda-and-ase-leed-daylight-points","status":"publish","type":"insight","link":"https:\/\/altaintegra.com\/vi\/insight\/sda-and-ase-leed-daylight-points\/","title":{"rendered":"Where LEED Daylight Points Come From in sDA and ASE Results"},"content":{"rendered":"<p class=\"ins-p\">In LEED v5, an sDA and ASE simulation can earn up to 4 points. The points are based on one number, the average sDA<sub>300\/50%<\/sub> across the regularly occupied floor area. The first point needs an average of at least 40%, and the full 4 points need 75%, with the steps in between shown in the table below.<\/p>\n<p class=\"ins-p\">The ASE result has a different role, because it has no point value of its own. In v5, any regularly occupied space with ASE<sub>net(1000,250h)<\/sub> above 20% needs a written account of how its glare is handled, and no space may leave the average because its ASE is high. LEED v4.1 sets the same trigger at 10% and needs 75% for its top tier of 3 points.<\/p>\n<p class=\"ins-p\">This page covers what sDA and ASE measure, how each LEED version turns them into points, how a high ASE result can lower sDA, and what the results looked like on a LEED Gold office in Jakarta. It sits beside our wider review of <a href=\"\/insight\/leed-lighting-strategy-v5-v4-1\/\">lighting credits in LEED v5 and v4.1<\/a>.<\/p>\n<div id=\"rank-math-toc\" class=\"wp-block-rank-math-toc-block\">\n<h2>Table of Contents<\/h2>\n<nav>\n<ul>\n<li><a href=\"#what-sda-and-ase-measure\">What sDA and ASE Measure in a Daylight Simulation<\/a><\/li>\n<li><a href=\"#blinds-in-sda-and-ase\">How Blinds Are Treated in sDA and ASE Calculations<\/a><\/li>\n<li><a href=\"#sda-and-ase-points\">sDA and ASE Points in LEED v5 ID+C and LEED v4.1 ID+C<\/a><\/li>\n<li><a href=\"#ase-threshold-v4-to-v5\">How the ASE Threshold Changed From LEED v4 to v5<\/a><\/li>\n<li><a href=\"#sda-and-ase-simulation-rules\">sDA and ASE Simulation Requirements Checked in a LEED Review<\/a><\/li>\n<li><a href=\"#sda-and-ase-in-jakarta\">What Affects sDA and ASE Results in a Jakarta Office<\/a><\/li>\n<li><a href=\"#worked-example\">sDA and ASE Simulation for a LEED Gold Office in Jakarta<\/a><\/li>\n<li><a href=\"#design-moves\">How Building Design Can Increase sDA and Reduce ASE<\/a><\/li>\n<li><a href=\"#summary\">Summary<\/a><\/li>\n<li><a href=\"#faq\">FAQ<\/a><\/li>\n<\/ul>\n<\/nav>\n<\/div>\n<p><img fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/2026\/08\/daylight.webp\" alt=\"sDA and ASE daylight distribution across a classroom floor grid\" width=\"1024\" height=\"576\" title=\"\"><\/p>\n<h2 class=\"ins-h2\" id=\"what-sda-and-ase-measure\">What sDA and ASE Measure in a Daylight Simulation<\/h2>\n<p class=\"ins-p\">Spatial daylight autonomy, written sDA<sub>300\/50%<\/sub>, is the share of an analysis area that reaches at least 300 lux from daylight for at least half of the annual occupied hours. A room with sDA of 60% has 60% of its grid points passing that test. The rest of the floor falls short for more than half the year.<\/p>\n<p class=\"ins-p\">Annual sunlight exposure, written ASE<sub>1000,250<\/sub>, is the share of the area that receives more than 1,000 lux of direct sunlight for more than 250 occupied hours a year. It flags the risk of glare and solar heat gain. Simulation software documentation describes it as a risk indicator that does not measure visual discomfort itself.<\/p>\n<p class=\"ins-p\">Both values come from an hourly simulation over a full year of weather data. The ASHRAE study cited below counts 3,650 analysis hours a year, ten hours a day from 8 a.m. to 6 p.m. local time. The same room scores differently in two cities with different weather files, since sDA and ASE both depend on the local sun and sky.<\/p>\n<h2 class=\"ins-h2\" id=\"blinds-in-sda-and-ase\">How Blinds Are Treated in sDA and ASE Calculations<\/h2>\n<p class=\"ins-p\">The sDA calculation assumes occupants lower the blinds when direct sun reaches the work plane. Under IES LM-83-12, as applied in the ASHRAE study, shades close whenever more than 2% of the analysis points receive direct sunlight. A shade with unknown properties is modelled at 5% diffuse transmittance.<\/p>\n<p class=\"ins-p\">ASE is calculated with no blinds or shades in the model, while sDA is calculated with them. On a facade that admits a lot of low sun, ASE is high and the simulated blinds stay closed for more hours, which lowers sDA. External shading blocks that sun before it reaches the glass and improves both sDA and ASE, while internal blinds reduce glare for occupants but still lower sDA whenever they are closed.<\/p>\n<p class=\"ins-p\">This is how sDA and ASE interact in the LEED score in practice. A high ASE result usually means the simulated blinds are closed more often, and that lowers the average sDA on which the points are based.<\/p>\n<h2 class=\"ins-h2\" id=\"sda-and-ase-points\">sDA and ASE Points in LEED v5 ID+C and LEED v4.1 ID+C<\/h2>\n<div class=\"ins-table-wrap\">\n<table class=\"ins-table\">\n<thead>\n<tr>\n<th>Item<\/th>\n<th>LEED v5 ID+C<\/th>\n<th>LEED v4.1 ID+C<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Where the points sit<\/td>\n<td>EQc2 Occupant Experience, Option 5, Path 4 Daylight Simulation<\/td>\n<td>EQ Credit Daylight, Option 1 Simulation<\/td>\n<\/tr>\n<tr>\n<td>Calculation method<\/td>\n<td>IES LM-83-23<\/td>\n<td>IES LM-83-12<\/td>\n<\/tr>\n<tr>\n<td>1 point<\/td>\n<td>Average sDA of 40% or more<\/td>\n<td>Average sDA<sub>300\/50%<\/sub> of 40% or more<\/td>\n<\/tr>\n<tr>\n<td>2 points<\/td>\n<td>Average sDA of 55% or more<\/td>\n<td>Average sDA<sub>300\/50%<\/sub> of 55% or more<\/td>\n<\/tr>\n<tr>\n<td>3 points<\/td>\n<td>Average sDA of 65% or more<\/td>\n<td>Average sDA<sub>300\/50%<\/sub> of 75% or more<\/td>\n<\/tr>\n<tr>\n<td>4 points<\/td>\n<td>Average sDA of 75% or more<\/td>\n<td>Not available, 1 extra point if every space reaches 55% and only 1 or 2 points were earned<\/td>\n<\/tr>\n<tr>\n<td>ASE level that calls for a glare response<\/td>\n<td>ASE<sub>net(1000,250h)<\/sub> above 20%<\/td>\n<td>ASE<sub>1000,250<\/sub> above 10%<\/td>\n<\/tr>\n<tr>\n<td>Excluding spaces because of ASE<\/td>\n<td>Not allowed<\/td>\n<td>Not addressed<\/td>\n<\/tr>\n<tr>\n<td>Areas without visual tasks<\/td>\n<td>sDA<sub>150\/50%<\/sub> allowed, 225 lux design target<\/td>\n<td>No equivalent<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p class=\"ins-p ins-table-caption\">The entry tiers match in both versions. LEED v5 adds a 65% tier, moves 75% up to 4 points and doubles the ASE level that calls for a glare response.<\/p>\n<p class=\"ins-p\">In v5 the daylight simulation is Path 4 of Option 5, Lighting Environment, inside EQc2 Occupant Experience. Option 5 is worth up to 6 points, made of Solar Glare (1), Quality Electric Lighting (1) and either Proximity to Windows (1) or Daylight Simulation (1 to 4). EQc2 as a whole is capped at 7 points.<\/p>\n<p class=\"ins-p\">The table follows LEED v5 ID+C, the rating system for interior fit-outs, in its July 2026 edition. LEED v5 BD+C sets the same daylight requirements for whole buildings.<\/p>\n<p class=\"ins-p\">In v4.1 the simulation is Option 1 of the Daylight credit, worth 1 to 3 points. Glare-control devices in all regularly occupied spaces are a condition of the whole credit.<\/p>\n<h2 class=\"ins-h2\" id=\"ase-threshold-v4-to-v5\">How the ASE Threshold Changed From LEED v4 to v5<\/h2>\n<p class=\"ins-p\">LEED v4 treated sDA and ASE as a joint pass condition. A study of that version records that Option 1 needed sDA of at least 55% together with ASE<sub>1000,250<\/sub> on less than 10% of the regularly occupied floor area.<\/p>\n<p class=\"ins-p\">LEED v4.1 still requires ASE to be calculated, but its change log records that the specific 10% threshold was removed as a pass condition. In v4.1, 10% instead marks the spaces that must explain their glare design. v4.1 also lowered the entry tier from 55% to 40%.<\/p>\n<p class=\"ins-p\">LEED v5 raises the trigger to ASE<sub>net(1000,250h)<\/sub> above 20% and adds a rule v4.1 never had. Spaces may not be excluded from the sDA average on the basis of ASE. A sunny corner office stays in the calculation with whatever sDA its blinds allow.<\/p>\n<h2 class=\"ins-h2\" id=\"sda-and-ase-simulation-rules\">sDA and ASE Simulation Requirements Checked in a LEED Review<\/h2>\n<ul class=\"ins-list\">\n<li>Method: IES LM-83-23 for v5 and IES LM-83-12 for v4.1. A v5 report built on the 2012 method uses the wrong edition.<\/li>\n<li>Scope: sDA and ASE for each regularly occupied space, plus the average sDA for the total regularly occupied floor area.<\/li>\n<li>Grid: v4.1 asks for calculation points no more than 600 mm apart at a work plane 30 inches above the floor. The April 2021 guide prints that height as 76 millimetres, a typo for about 760 mm.<\/li>\n<li>Weather: an hourly typical meteorological year file, or an equivalent, from the nearest available station.<\/li>\n<li>Obstructions: permanent interior obstructions are modelled. Movable furniture and partitions may be left out.<\/li>\n<li>Core and Shell in v4.1: where finishes are unknown, use reflectances of 80% for ceilings, 50% for walls and 20% for floors, and treat the whole floor area outside the core as regularly occupied.<\/li>\n<li>Areas without visual tasks in v5: sDA<sub>150\/50%<\/sub> may replace sDA<sub>300\/50%<\/sub>, with a design target of 225 lux.<\/li>\n<\/ul>\n<h2 class=\"ins-h2\" id=\"sda-and-ase-in-jakarta\">What Affects sDA and ASE Results in a Jakarta Office<\/h2>\n<p class=\"ins-p\">Jakarta sits about 6 degrees south of the equator, so the sun passes high overhead for much of the year. Midday sun lands mostly on roofs and overhangs. Low morning and afternoon sun strikes east and west glazing, and those facades tend to decide the sDA and ASE outcome.<\/p>\n<p class=\"ins-p\">Deep rooms are hard to score well on sDA, because daylight falls off quickly with distance from the window. LEED v5 offers a simpler 1-point route for that reason: at least 30% of the regularly occupied area within 6 metres of envelope glazing with visible light transmittance above 40%. A project can use only one of the two routes, and the simulation route is the one that can reach 4 points.<\/p>\n<p class=\"ins-p\">The choice of glass affects both sDA and ASE. Higher visible light transmittance raises sDA, and the same unshaded glass on a west facade raises ASE as well. Our <a href=\"\/insight\/daylight-calculator-guide\/\">daylight calculator guide<\/a> explains a point-in-time illuminance check of a room and its windows that can come before a full annual run.<\/p>\n<h2 class=\"ins-h2\" id=\"worked-example\">sDA and ASE Simulation for a LEED Gold Office in Jakarta<\/h2>\n<p class=\"ins-p\">ALTA Integra ran the sDA and ASE study for a <a href=\"\/insight\/leed-gold-jakarta-investment-bank-office\/\">global investment bank&#8217;s Jakarta office<\/a>, a tenant fit-out certified LEED Gold. Its sDA and ASE study was carried out under LEED v4.1 ID+C, so the v4.1 tiers and the 10% ASE trigger applied.<\/p>\n<p class=\"ins-p\">Two office floors, F26 and F27, were modelled with a Jakarta typical weather file. Grid points sat 0.5 m apart and 0.3 m in from the walls, inside the 600 mm maximum the credit allows. Blinds on each facade closed in stages of 25%, 50%, 75% and 100%, driven by the illuminance at a sample sensor point.<\/p>\n<figure><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/2026\/11\/sda-ase-simulation-office-floor-26.webp\" alt=\"sDA and ASE simulation maps for office floor F26 of a LEED Gold fit-out in Jakarta\" width=\"1428\" height=\"573\" loading=\"lazy\" title=\"\"><\/figure>\n<p class=\"ins-p\">The blind schedule in the sDA and ASE model was based on the orientation of each facade. The north facade, turned 23 degrees west of north, took strong sun from 13.00 to 17.00 in the dry months of May to July. East blinds closed on dry-season mornings from 06.00 to 10.00, and west blinds closed in the late afternoon.<\/p>\n<div class=\"ins-table-wrap\">\n<table class=\"ins-table\">\n<thead>\n<tr>\n<th>Design-stage result<\/th>\n<th>F26<\/th>\n<th>F27<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Average sDA<sub>300\/50%<\/sub><\/td>\n<td>45.47%<\/td>\n<td>46.59%<\/td>\n<\/tr>\n<tr>\n<td>Average ASE<sub>1000,250<\/sub><\/td>\n<td>17.32%<\/td>\n<td>14.68%<\/td>\n<\/tr>\n<tr>\n<td>v4.1 tier reached<\/td>\n<td>40%, 1 point<\/td>\n<td>40%, 1 point<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p class=\"ins-p ins-table-caption\">Results from the September 2025 sDA and ASE study. Both floors cleared the 40% tier, and both crossed the 10% ASE trigger that calls for a glare response.<\/p>\n<p class=\"ins-p\">The enclosed rooms in the core lowered the sDA and ASE averages on both floors. Focus rooms, small meeting rooms and support rooms away from the facade scored 0% sDA, while perimeter rooms such as the library and a corner office reached 100%. Several bright perimeter rooms also passed 40% ASE, and one sales and trading room reached 100%.<\/p>\n<figure><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/2026\/11\/sda-ase-simulation-office-floor-27.webp\" alt=\"sDA and ASE simulation maps for office floor F27 of a LEED Gold fit-out in Jakarta\" width=\"1428\" height=\"579\" loading=\"lazy\" title=\"\"><\/figure>\n<p class=\"ins-p\">With ASE above 10% on both floors, the design had to show how glare was handled. The answer was the manual blinds already in the building, which occupants lower against low morning and afternoon sun. GBCI awarded 1 of 3 points on a reported average sDA of 42.45%.<\/p>\n<p class=\"ins-p\">The review left one note that is useful for any LEED project. The team had marked 2 points as attempted, and the reviewer pointed out that 42.45% qualifies for 1. The submitted figure also sits below the design-stage averages of 45.47% and 46.59%, a reason to keep a margin above each tier.<\/p>\n<h2 class=\"ins-h2\" id=\"design-moves\">How Building Design Can Increase sDA and Reduce ASE<\/h2>\n<p class=\"ins-p\">Most improvements in sDA and ASE come from the facade and the building section. These are <a href=\"\/services\/passive-design\/\">passive design<\/a> decisions, made well before the simulation runs.<\/p>\n<ul class=\"ins-list\">\n<li>External shading sized to the sun angles on each facade, which blocks direct sun before it enters and keeps the simulated blinds open for more hours.<\/li>\n<li>Taller window heads and higher ceilings, which carry daylight deeper into the plan.<\/li>\n<li>Light-coloured ceilings and walls, since reflected light extends the daylit zone.<\/li>\n<li>Glazing chosen per facade, with higher visible light transmittance where external shading already stops direct sun.<\/li>\n<li>Enclosed rooms and full-height partitions kept away from the facade, since permanent obstructions are modelled and cut sDA.<\/li>\n<li>A written glare response for each space above the ASE trigger, naming the device and how it is controlled.<\/li>\n<\/ul>\n<h2 class=\"ins-h2\" id=\"summary\">Summary<\/h2>\n<ul class=\"ins-list\">\n<li>LEED daylight points are based on the average sDA<sub>300\/50%<\/sub>, and ASE has no point value.<\/li>\n<li>LEED v5 awards 1 to 4 points for an average sDA from 40% up to 75%, triggers a glare response above 20% ASE and allows no exclusions for ASE.<\/li>\n<li>LEED v4.1 awards 1 to 3 points for an average sDA from 40% up to 75% and triggers a glare response above 10% ASE.<\/li>\n<li>A high ASE lowers sDA through the simulated blinds, so external shading helps both sDA and ASE.<\/li>\n<li>Registration for LEED v4 and v4.1 commercial projects closes on 30 June 2027. New projects after that date use v5.<\/li>\n<\/ul>\n<h2 class=\"ins-h2\" id=\"faq\">FAQ<\/h2>\n<div class=\"ins-faq\">\n<div class=\"ins-faq-item\">\n<p class=\"ins-faq-q\"><strong>How do sDA and ASE affect the LEED daylight score?<\/strong><\/p>\n<p class=\"ins-faq-a\">The points are based on sDA alone, and ASE has no point value in LEED v5 or v4.1. Spaces above the trigger, 20% in v5 and 10% in v4.1, must document how glare is controlled. A high ASE also tends to lower the average sDA, because the simulated blinds stay closed for more hours.<\/p>\n<\/div>\n<div class=\"ins-faq-item\">\n<p class=\"ins-faq-q\"><strong>What sDA is needed for 4 points in LEED v5?<\/strong><\/p>\n<p class=\"ins-faq-a\">An average sDA<sub>300\/50%<\/sub> of at least 75% across the total regularly occupied floor area earns the full 4 points under EQc2 Option 5 Path 4. The table above lists the lower tiers, which start at 1 point for an average of 40%. Areas without visual tasks may use sDA<sub>150\/50%<\/sub> against a 225 lux design target.<\/p>\n<\/div>\n<div class=\"ins-faq-item\">\n<p class=\"ins-faq-q\"><strong>Can high-ASE spaces be excluded from the LEED v5 calculation?<\/strong><\/p>\n<p class=\"ins-faq-a\">No. LEED v5 states that spaces are not to be excluded on the basis of annual sunlight exposure. Every regularly occupied space stays in the average sDA, and any space with ASE<sub>net(1000,250h)<\/sub> above 20% needs a description of how it is designed to address glare.<\/p>\n<\/div>\n<div class=\"ins-faq-item\">\n<p class=\"ins-faq-q\"><strong>Which standard sets the sDA and ASE calculation in LEED?<\/strong><\/p>\n<p class=\"ins-faq-a\">LEED v5 uses IES LM-83-23, the 2023 edition of the IES method for spatial daylight autonomy and annual sunlight exposure. LEED v4.1 references the 2012 edition, IES LM-83-12. The version follows the project&#8217;s registration, and registration under v4 and v4.1 for commercial projects closes on 30 June 2027.<\/p>\n<\/div>\n<div class=\"ins-faq-item\">\n<p class=\"ins-faq-q\"><strong>Who runs sDA and ASE simulations for LEED projects in Jakarta?<\/strong><\/p>\n<p class=\"ins-faq-a\">ALTA Integra is a Jakarta-based consultancy whose <a href=\"\/services\/green-building-certification\/\">green building certification<\/a> scope covers spatial daylight autonomy simulation. The team can set up the sDA and ASE model, read the results against the LEED tier a project is targeting and advise on the shading and glazing changes that move the score.<\/p>\n<\/div>\n<\/div>\n<h2 class=\"ins-h2\" id=\"sources\">Sources<\/h2>\n<ol class=\"ins-sources\">\n<li><a href=\"https:\/\/www.usgbc.org\/sites\/default\/files\/2026-03\/LEED%20v5%20BD%2BC%20Rating%20System_February%202026.pdf\" target=\"_blank\" rel=\"noopener\">U.S. Green Building Council, &#8220;LEED v5 BD+C Rating System, February 2026 Edition&#8221;<\/a>, for EQc2 Option 5, the sDA tiers, the ASE trigger and the exclusion rule.<\/li>\n<li><a href=\"https:\/\/www.usgbc.org\/sites\/default\/files\/2026-07\/LEED%20v5%20ID%2BC%20Rating%20System_July%202026.pdf\" target=\"_blank\" rel=\"noopener\">U.S. Green Building Council, &#8220;LEED v5 ID+C Rating System, July 2026 Edition&#8221;<\/a>, for the same EQc2 Option 5 daylight requirements applied to interior fit-outs.<\/li>\n<li><a href=\"https:\/\/leeduser.buildinggreen.com\/credit\/CI-v4.1\/EQc7\" target=\"_blank\" rel=\"noopener\">BuildingGreen LEEDuser, &#8220;CI-v4.1 EQc7: Daylight&#8221;<\/a>, for the LEED v4.1 ID+C credit text, its sDA tiers and the 10% ASE trigger.<\/li>\n<li><a href=\"https:\/\/certificationwiki.gbci.org\/images\/a\/a3\/LEED_v4.1_BD+C_Guide_April_2021.pdf\" target=\"_blank\" rel=\"noopener\">GBCI, &#8220;LEED v4.1 BD+C Guide, April 2021&#8221;<\/a>, for the v4.1 Daylight credit, the grid and Core and Shell defaults, and the change log on ASE.<\/li>\n<li><a href=\"https:\/\/www.aivc.org\/sites\/default\/files\/1_C48.pdf\" target=\"_blank\" rel=\"noopener\">Esmailian, Mistrick, Poerschke and Iulo, &#8220;A Study of Daylight Modeling Approaches Applied in LEED&#8221;, ASHRAE 2021<\/a>, for the LEED v4 thresholds, the 3,650 analysis hours and the 2% shade rule.<\/li>\n<li><a href=\"https:\/\/help.iesve.com\/ve2026\/3_2_4_5__annual_sunlight_exposure__ase_.htm\" target=\"_blank\" rel=\"noopener\">IES VE, &#8220;Annual Sunlight Exposure (ASE)&#8221;<\/a>, on ASE as a risk indicator calculated without blinds.<\/li>\n<li><a href=\"https:\/\/lightstanza.com\/daylight-reference-guide\/\" target=\"_blank\" rel=\"noopener\">LightStanza, &#8220;Daylight Reference Guide&#8221;<\/a>, on how blind operation enters the sDA calculation.<\/li>\n<li><a href=\"https:\/\/www.usgbc.org\/articles\/leed-v4-and-v41-commercial-registration-close-extended-june-30-2027\" target=\"_blank\" rel=\"noopener\">USGBC, &#8220;LEED v4 and v4.1 commercial registration close extended to June 30, 2027&#8221;<\/a>, for the registration deadline.<\/li>\n<\/ol>\n","protected":false},"excerpt":{"rendered":"<p>Average sDA directly determines your LEED daylight credits, while ASE acts as a check to flag spaces requiring explicit glare management.<\/p>\n","protected":false},"author":0,"featured_media":2732,"template":"","meta":{"_acf_changed":false,"footnotes":""},"subsector":[],"stream":[108],"class_list":["post-2694","insight","type-insight","status-publish","has-post-thumbnail","hentry","stream-knowledge"],"acf":[],"_links":{"self":[{"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/insights\/2694","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/insights"}],"about":[{"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/types\/insight"}],"version-history":[{"count":11,"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/insights\/2694\/revisions"}],"predecessor-version":[{"id":2724,"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/insights\/2694\/revisions\/2724"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/media\/2732"}],"wp:attachment":[{"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/media?parent=2694"}],"wp:term":[{"taxonomy":"subsector","embeddable":true,"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/subsector?post=2694"},{"taxonomy":"stream","embeddable":true,"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/stream?post=2694"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}