{"id":317,"date":"2026-06-25T09:18:45","date_gmt":"2026-06-25T09:18:45","guid":{"rendered":"https:\/\/altaintegra.com\/project\/bursa-efek-indonesia\/"},"modified":"2026-08-24T17:05:32","modified_gmt":"2026-08-24T17:05:32","slug":"indonesia-stock-exchange-building","status":"publish","type":"project","link":"https:\/\/altaintegra.com\/vi\/project\/indonesia-stock-exchange-building\/","title":{"rendered":"Indonesia Stock Exchange Building"},"content":{"rendered":"<p class=\"proj-p\">This is a corporate, education, and healthcare project completed in 2021 in Jakarta, ID, part of ALTA Integra&#8217;s Acoustic Engineering, Audiovisual and Lighting Design portfolio.<\/p>\n<div id=\"rank-math-toc\" class=\"wp-block-rank-math-toc-block\">\n<h2>Table of Contents<\/h2>\n<nav>\n<ul>\n<li><a href=\"#project-overview\">Project Overview<\/a><\/li>\n<li><a href=\"#project-scope\">Indonesia Stock Exchange Building, Engineering Scope<\/a><\/li>\n<li><a href=\"#project-details\">Indonesia Stock Exchange Building, Project Details<\/a><\/li>\n<li><a href=\"#related-work\">Related Indonesia Stock Exchange Building Work<\/a><\/li>\n<\/ul>\n<\/nav>\n<\/div>\n<h2 id=\"project-overview\" class=\"proj-h2\">Project Overview<\/h2>\n<p><!--alta-seo-block--><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/main-hall-bei-3.jpg\" alt=\"Indonesia Stock Exchange Building, Indonesia Stock Exchange Building engineering by ALTA Integra\" loading=\"lazy\" title=\"\"><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/main-hall-bei-2.webp\" alt=\"Indonesia Stock Exchange Building, Indonesia Stock Exchange Building engineering by ALTA Integra (view 2)\" loading=\"lazy\" title=\"\"><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/main-hall-bei-4.webp\" alt=\"Indonesia Stock Exchange Building, Indonesia Stock Exchange Building engineering by ALTA Integra (view 3)\" loading=\"lazy\" title=\"\"><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/main-hall-bei-5.webp\" alt=\"Indonesia Stock Exchange Building, Indonesia Stock Exchange Building engineering by ALTA Integra (view 4)\" loading=\"lazy\" title=\"\"><br \/>\n<!--\/alta-seo-block--><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/main-hall-bei-2.webp\" alt=\"Indonesia Stock Exchange Building, Acoustic Engineering by ALTA Integra\" title=\"\"><\/p>\n<p class=\"proj-p\">In 2020, Indonesia Stock Exchange selected ALTA Integra, through a beauty-contest process against other Indonesian consultants, to redesign the lighting, acoustics, and audio systems of its Main Hall, the trading-floor space that represents Indonesia&#8217;s capital market to visitors, media, and global partners. The scope brought architectural lighting, room acoustics, and audio system design together as one integrated brief rather than three separate installations.<\/p>\n<p class=\"proj-p\">The lighting design moved from stakeholder workshops and hand sketches through to a finalised concept, detailed specification, and a scenario-preview animation built in DIALux Evo so the client could evaluate how the space would look and feel before anything was installed. Tunable RGB ceiling fixtures let the Main Hall shift between thematic lighting states, red and white for Indonesian Independence Day, or a slow biomimicry-daylight sequence that echoes the natural progression from dawn to dusk, layered on top of an acoustically improved room. Through construction, the team ran periodic site inspections to check that installed light fixtures and audio components matched specification, coordinating closely with other trades so the finished ceiling and wall integrations read as one cohesive system.<\/p>\n<p class=\"proj-p\">By the end of 2021, the lighting, audio, and acoustic work was commissioned and the refreshed Main Hall was ready for that year&#8217;s Stock Trading Closing Ceremony, the exchange&#8217;s most visible annual moment, presented at year-end to national leadership and broadcast as the public face of Indonesia&#8217;s capital market.<\/p>\n<p class=\"proj-p\">Client: <a href=\"https:\/\/en.wikipedia.org\/wiki\/Indonesia_Stock_Exchange\" target=\"_blank\" rel=\"noopener\">Indonesia Stock Exchange Building<\/a>.<\/p>\n<h2 id=\"project-scope\" class=\"proj-h2\">Indonesia Stock Exchange Building, Engineering Scope<\/h2>\n<p class=\"proj-p\">ALTA Integra&#8217;s <a href=\"https:\/\/altaintegra.com\/services\/acoustic-consultant\/\">Acoustic Engineering<\/a> practice covers reverberation control, noise isolation, speech intelligibility, and room acoustic modelling, verified through on-site acoustic measurement. On a completed project, this typically means checking the finished space against the same targets used at the design stage, rather than treating acoustic modelling as a one-off design exercise.<\/p>\n<p class=\"proj-p\">The <a href=\"https:\/\/altaintegra.com\/services\/audiovisual-consultant\/\">Audiovisual<\/a> discipline covers sound reinforcement, video and display integration, and control-system design, coordinated alongside the acoustic and lighting scope. Equipment selection and signal routing are planned early enough that AV racks, cabling, and control points can be built into the architecture rather than retrofitted.<\/p>\n<p class=\"proj-p\"><a href=\"https:\/\/altaintegra.com\/services\/lighting-designer\/\">Lighting Design<\/a> work covers illuminance levels, colour temperature, and light layering, balancing visual comfort with the space&#8217;s architectural character. Fixture selection and control zoning are worked out alongside the electrical and interior design teams so the finished lighting reads as one coherent layer, not a collection of separate fittings.<\/p>\n<p class=\"proj-p\">As part of ALTA Integra&#8217;s Corporate, Education, and Healthcare portfolio, Indonesia Stock Exchange Building sits among workplace, learning, and clinical environments, where comfort and speech clarity are day-to-day performance requirements, not one-off events.<\/p>\n<p class=\"proj-p\">ALTA Integra&#8217;s process on Indonesia Stock Exchange Building followed its standard sequence: coordinating Acoustic Engineering, Audiovisual and Lighting Design as a single scope rather than 3 separate hand-offs; modelling the relevant engineering criteria before construction, then verifying the finished result against those same targets on site.<\/p>\n<p class=\"proj-p\">Indonesia Stock Exchange Building falls within ALTA Integra&#8217;s Corporate Office work, day-to-day office environments, where speech privacy in meeting rooms and consistent lighting across floors matter more than dramatic design statements.<\/p>\n<p class=\"proj-p\">Other Corporate, Education, and Healthcare projects in ALTA Integra&#8217;s portfolio include <a href=\"https:\/\/altaintegra.com\/project\/santo-ignatius-building-canisius-college\/\">Santo Ignatius Building Canisius College<\/a>, <a href=\"https:\/\/altaintegra.com\/project\/audiovisual-room-canisius-college\/\">Audiovisual Room Canisius College<\/a>.<\/p>\n<h2 id=\"project-details\" class=\"proj-h2\">Indonesia Stock Exchange Building, Project Details<\/h2>\n<p class=\"proj-p\">Before handover, ALTA Integra&#8217;s standard practice is to walk the finished space against the original design brief for Indonesia Stock Exchange Building, checking that installed equipment, room treatments, and control systems match what was specified, and flagging any adjustment needed before the space goes into daily use. This final verification step is treated as part of the project&#8217;s scope, not an optional add-on, since a design that only works on paper or in a simulation isn&#8217;t actually finished until it has been confirmed against the real, built result.<\/p>\n<p class=\"proj-p\">ALTA Integra documents every project like Indonesia Stock Exchange Building the same way: real measured or modelled targets, the actual disciplines and taxonomy under which the work is filed, and the people and organizations involved, kept consistent across the portfolio so any project can be compared against another on the same terms rather than described in one-off marketing language. That consistency matters more once a portfolio spans dozens of projects across different sectors, without a shared documentation standard, a client-facing case study and an internal engineering record would quietly drift into two different tellings of the same project.<\/p>\n<p class=\"proj-p\">Projects the size of Indonesia Stock Exchange Building also test how well a design holds up once it leaves the drawing board, a target reverberation time, an isolation figure, or a lighting level is only meaningful once it survives contact with the actual materials, contractors, and site conditions available on a real build, which is exactly why ALTA Integra treats the field-verification stage as equal in importance to the original design work rather than a formality that happens after the real work is done.<\/p>\n<p class=\"proj-p\">Every entry in ALTA Integra&#8217;s portfolio, including Indonesia Stock Exchange Building, is tagged against the same fixed taxonomy of portfolio category, subsector, engineering discipline, and, where relevant, strategic focus and integration type, rather than a free-text description that would vary from one project write-up to the next. That consistent tagging is what lets a visitor filter the portfolio by sector or discipline and get a meaningful, comparable result instead of a loosely related grab-bag of past work.<\/p>\n<p class=\"proj-p\">The project&#8217;s scope included engineering disciplines covering Acoustic Engineering, Audiovisual and Lighting Design.<\/p>\n<p class=\"proj-p\">It is located in Jakarta, ID, completed in 2021, classified under the Corporate Office subsector and within ALTA Integra&#8217;s Corporate, Education, and Healthcare portfolio category.<\/p>\n<p class=\"proj-p\">This case study documents ALTA Integra&#8217;s acoustic engineering approach for this project.<\/p>\n<p><!--alta-seo-block--><\/p>\n<h2 id=\"related-work\" class=\"proj-h2\">Related Indonesia Stock Exchange Building Work and Further Reading<\/h2>\n<p class=\"proj-p\">The Indonesia Stock Exchange Building work on this project connects directly to the engineering below, other ALTA Integra projects in the same sector, and the technical insights explaining the methods used here.<\/p>\n<ul class=\"proj-related\">\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/nusantara-tv.png\" alt=\"Nusantara TV Tower, related Indonesia Stock Exchange Building work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Project:<\/strong> <a href=\"https:\/\/altaintegra.com\/project\/nt-tower-jakarta\/\">Nusantara TV Tower<\/a>, Acoustic, lighting, and audiovisual design across the Nusantara TV Tower, daily news production, talk-shows, and live-to-air specials share the building with corporate offices, an auditorium, and\u2026<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/mandiri-university-14.webp\" alt=\"Mandiri University, related Indonesia Stock Exchange Building work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Project:<\/strong> <a href=\"https:\/\/altaintegra.com\/project\/mandiri-university-jakarta\/\">Mandiri University<\/a>, A corporate university where classrooms, lecture halls, and the lobby are part of one acoustic and lighting strategy.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/bpkp.png\" alt=\"The Development Finance Comptroller (BPKP), related Indonesia Stock Exchange Building work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Project:<\/strong> <a href=\"https:\/\/altaintegra.com\/project\/bpkp\/\">The Development Finance Comptroller (BPKP)<\/a>, Acoustic, AV, lighting, and design guidelines for BPKP&#8217;s corporate office building in Jakarta.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/2026\/07\/01_Kolaborasi_ALTA_Integra_jpg.webp\" alt=\"Green Building Certification Consultant Indonesia, related Indonesia Stock Exchange Building work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Insight:<\/strong> <a href=\"https:\/\/altaintegra.com\/insight\/green-building-certification-consultant\/\">Green Building Certification Consultant Indonesia<\/a>, ALTA Integra provides green building certification consulting for Greenship, EDGE, BGH, and LEED, integrating design with project management.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/2026\/07\/01_1_jpg.webp\" alt=\"Thermal Comfort in Indonesian Building Design, related Indonesia Stock Exchange Building work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Insight:<\/strong> <a href=\"https:\/\/altaintegra.com\/insight\/thermal-comfort-standard-indonesia\/\">Thermal Comfort in Indonesian Building Design<\/a>, How Indonesia&#8217;s SNI standard defines comfortable indoor temperature and humidity, and how architects design buildings around it.<\/li>\n<\/ul>\n<p><!--\/alta-seo-block--><\/p>\n","protected":false},"featured_media":1306,"template":"","portfolio":[44],"discipline":[28,37,30],"strategic":[],"integration":[],"subsector":[66],"class_list":["post-317","project","type-project","status-publish","has-post-thumbnail","hentry","portfolio-corporate-education-and-healthcare","discipline-acoustic-consultant","discipline-audiovisual-consultant","discipline-lighting-designer","subsector-corporate-office"],"acf":[],"_links":{"self":[{"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/projects\/317","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/types\/project"}],"version-history":[{"count":7,"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/projects\/317\/revisions"}],"predecessor-version":[{"id":2118,"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/projects\/317\/revisions\/2118"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/media\/1306"}],"wp:attachment":[{"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/media?parent=317"}],"wp:term":[{"taxonomy":"portfolio","embeddable":true,"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/portfolio?post=317"},{"taxonomy":"discipline","embeddable":true,"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/discipline?post=317"},{"taxonomy":"strategic","embeddable":true,"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/strategic?post=317"},{"taxonomy":"integration","embeddable":true,"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/integration?post=317"},{"taxonomy":"subsector","embeddable":true,"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/subsector?post=317"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}