{"id":318,"date":"2026-06-25T09:18:50","date_gmt":"2026-06-25T09:18:50","guid":{"rendered":"https:\/\/altaintegra.com\/project\/nice-pik2\/"},"modified":"2026-10-26T04:16:23","modified_gmt":"2026-10-26T04:16:23","slug":"nice-pik2-convention-exhibition","status":"publish","type":"project","link":"https:\/\/altaintegra.com\/vi\/project\/nice-pik2-convention-exhibition\/","title":{"rendered":"NICE PIK 2, Nusantara Int\u2019l Convention Exhibition"},"content":{"rendered":"<p class=\"proj-p\">This is a public buildings and spaces project completed in 2026 in Jakarta, ID, part of ALTA Integra&#8217;s Audiovisual portfolio.<\/p>\n<div id=\"rank-math-toc\" class=\"wp-block-rank-math-toc-block\">\n<h2>Table of Contents<\/h2>\n<nav>\n<ul>\n<li><a href=\"#project-overview\">Project Overview<\/a><\/li>\n<li><a href=\"#project-scope\">NICE PIK2 Convention Exhibition, Engineering Scope<\/a><\/li>\n<li><a href=\"#project-details\">NICE PIK2 Convention Exhibition, Project Details<\/a><\/li>\n<li><a href=\"#related-work\">Related NICE Work<\/a><\/li>\n<\/ul>\n<\/nav>\n<\/div>\n<h2 id=\"project-overview\" class=\"proj-h2\">Project Overview<\/h2>\n<p><!--alta-seo-block--><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/nice-pik-2-1.jpg\" alt=\"NICE PIK 2, Nusantara Int\u2019l Convention Exhibition, nice engineering by ALTA Integra\" loading=\"lazy\" title=\"\"><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/nice-pik-2-2.jpg\" alt=\"NICE PIK 2, Nusantara Int\u2019l Convention Exhibition, nice engineering by ALTA Integra (view 2)\" loading=\"lazy\" title=\"\"><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/nice-pik-2.jpg\" alt=\"NICE PIK 2, Nusantara Int\u2019l Convention Exhibition, nice engineering by ALTA Integra (view 3)\" loading=\"lazy\" title=\"\"><br \/>\n<!--\/alta-seo-block--><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/nice-pik-2-1.jpg\" alt=\"NICE PIK2 Convention Exhibition, Audiovisual by ALTA Integra\" title=\"\"><\/p>\n<p class=\"proj-p\">NICE (Nusantara International Convention Exhibition) PIK2 is Indonesia&#8217;s largest MICE venue, 40 hectares in the Pantai Indah Kapuk 2 business district, with 130,000 m\u00b2 of event space split across public areas, commercial zones, and event-driven spaces. That mix demanded a single AV architecture that could scale across public information, branding activation, and hybrid collaboration without splintering into separate systems per zone.<\/p>\n<p class=\"proj-p\">ALTA Integra designed a building-wide AV system on an AV-over-IP architecture, replacing traditional matrix-based analog signal routing with a network-centric one: scalable media distribution, flexible routing, and simpler expansion over standard network protocols, cutting cabling complexity while centralizing control of AV resources across the development. Hybrid meeting capability is built into the same infrastructure, with audio capture, speech intelligibility, and low-latency video tuned for interaction between physical and remote participants.<\/p>\n<p class=\"proj-p\">Operation runs through a single centralized control system: one interface for audio distribution, visual displays, and meeting environments, driven by pre-configured scenarios rather than manual per-subsystem setup, cutting the training required to run the building&#8217;s AV day to day.<\/p>\n<p class=\"proj-p\">NICE PIK2 Convention Exhibition was engineered against established <a href=\"https:\/\/en.wikipedia.org\/wiki\/Audiovisual\" target=\"_blank\" rel=\"noopener\">audiovisual systems<\/a> practice.<\/p>\n<h2 id=\"project-scope\" class=\"proj-h2\">NICE PIK2 Convention Exhibition, Engineering Scope<\/h2>\n<p class=\"proj-p\">The <a href=\"https:\/\/altaintegra.com\/services\/audiovisual-consultant\/\">Audiovisual<\/a> discipline covers sound reinforcement, video and display integration, and control-system design, coordinated alongside the acoustic and lighting scope. Equipment selection and signal routing are planned early enough that AV racks, cabling, and control points can be built into the architecture rather than retrofitted.<\/p>\n<p class=\"proj-p\">NICE PIK2 Convention Exhibition&#8217;s integration scope reflects ALTA Integra&#8217;s conference hall integration, covering AV, acoustics, and lighting for presentation and hybrid-meeting use.<\/p>\n<p class=\"proj-p\">As part of ALTA Integra&#8217;s Public Buildings and Spaces portfolio, NICE PIK2 Convention Exhibition sits among civic, cultural, and public-facing venues, where acoustics, lighting, and AV have to perform for large, varied audiences.<\/p>\n<p class=\"proj-p\">ALTA Integra&#8217;s process on NICE PIK2 Convention Exhibition followed its standard sequence: modelling the relevant engineering criteria before construction, then verifying the finished result against those same targets on site.<\/p>\n<p class=\"proj-p\">NICE PIK2 Convention Exhibition falls within ALTA Integra&#8217;s Convention &amp;amp; Exhibition work, large-format convention and exhibition halls, where sound and lighting systems have to reconfigure for many different event layouts in the same shell.<\/p>\n<p class=\"proj-p\">Other Public Buildings and Spaces projects in ALTA Integra&#8217;s portfolio include <a href=\"https:\/\/altaintegra.com\/project\/kereta-misteri-dunia-fantasi-jakarta\/\">Kereta Misteri Dunia Fantasi Jakarta<\/a>, <a href=\"https:\/\/altaintegra.com\/project\/maria-bunda-kita-pik-2-church\/\">Maria Bunda Kita PIK 2 Church<\/a>.<\/p>\n<h2 id=\"project-details\" class=\"proj-h2\">NICE PIK2 Convention Exhibition, Project Details<\/h2>\n<p class=\"proj-p\">Before handover, ALTA Integra&#8217;s standard practice is to walk the finished space against the original design brief for NICE PIK2 Convention Exhibition, checking that installed equipment, room treatments, and control systems match what was specified, and flagging any adjustment needed before the space goes into daily use. This final verification step is treated as part of the project&#8217;s scope, not an optional add-on, since a design that only works on paper or in a simulation isn&#8217;t actually finished until it has been confirmed against the real, built result.<\/p>\n<p class=\"proj-p\">ALTA Integra documents every project like NICE PIK2 Convention Exhibition the same way: real measured or modelled targets, the actual disciplines and taxonomy under which the work is filed, and the people and organizations involved, kept consistent across the portfolio so any project can be compared against another on the same terms rather than described in one-off marketing language. That consistency matters more once a portfolio spans dozens of projects across different sectors, without a shared documentation standard, a client-facing case study and an internal engineering record would quietly drift into two different tellings of the same project.<\/p>\n<p class=\"proj-p\">Projects the size of NICE PIK2 Convention Exhibition also test how well a design holds up once it leaves the drawing board, a target reverberation time, an isolation figure, or a lighting level is only meaningful once it survives contact with the actual materials, contractors, and site conditions available on a real build, which is exactly why ALTA Integra treats the field-verification stage as equal in importance to the original design work rather than a formality that happens after the real work is done.<\/p>\n<p class=\"proj-p\">Every entry in ALTA Integra&#8217;s portfolio, including NICE PIK2 Convention Exhibition, is tagged against the same fixed taxonomy of portfolio category, subsector, engineering discipline, and, where relevant, strategic focus and integration type, rather than a free-text description that would vary from one project write-up to the next. That consistent tagging is what lets a visitor filter the portfolio by sector or discipline and get a meaningful, comparable result instead of a loosely related grab-bag of past work.<\/p>\n<p class=\"proj-p\">The project&#8217;s scope included engineering disciplines covering Audiovisual; integration scope across Conference Halls.<\/p>\n<p class=\"proj-p\">It is located in Jakarta, ID, completed in 2026, classified under the Convention &amp;amp; Exhibition subsector and within ALTA Integra&#8217;s Public Buildings and Spaces portfolio category.<\/p>\n<p class=\"proj-p\">This case study documents ALTA Integra&#8217;s audiovisual approach for this project.<\/p>\n<p><!--alta-seo-block--><\/p>\n<h2 id=\"related-work\" class=\"proj-h2\">Related NICE Work and Further Reading<\/h2>\n<p class=\"proj-p\">The NICE work on this project connects directly to the engineering below, other ALTA Integra projects in the same sector, and the technical insights explaining the methods used here.<\/p>\n<ul class=\"proj-related\">\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/gereja-mbk-pik-2.png\" alt=\"Gereja MBK PIK 2 Jakarta, related nice work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Project:<\/strong> <a href=\"https:\/\/altaintegra.com\/project\/maria-bunda-kita-pik-2-church\/\">Gereja MBK PIK 2 Jakarta<\/a>, A contemporary Catholic worship space, clarity of the spoken word, warmth in music, and a lighting scheme that shifts between Sunday morning and evening service.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/museum-nasional.jpg\" alt=\"Museum Nasional Indonesia, related nice work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Project:<\/strong> <a href=\"https:\/\/altaintegra.com\/project\/museum-nasional-indonesia\/\">Museum Nasional Indonesia<\/a>, Restoration of Indonesia&#8217;s national museum, lighting and audiovisual design that honours the building&#8217;s 1862 heritage while meeting modern conservation and visitor standards.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/nokia.jpg\" alt=\"Nokia HQ, Capital Place Jakarta, related nice work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Project:<\/strong> <a href=\"https:\/\/altaintegra.com\/project\/nokia-headquarter-capital-place-jakarta\/\">Nokia HQ, Capital Place Jakarta<\/a>, Audiovisual integration for a global headquarters that hosts engineering workshops on a daily basis.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/2026\/07\/01_acoustics_hongkong_jpg.webp\" alt=\"Acoustics Hong Kong 2012 Conference, related nice work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Insight:<\/strong> <a href=\"https:\/\/altaintegra.com\/insight\/acoustics-hong-kong-2012\/\">Acoustics Hong Kong 2012 Conference<\/a>, ALTA Integra acoustic consultant Herwin Gunawan attended Acoustics Hong Kong 2012, an international acoustics research conference and trade fair.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/2026\/07\/01_consultation-vs-design-build-min_jpg.webp\" alt=\"Consultant or Design-Builder: Which Risk Are You Least Willing to Carry?, related nice work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Insight:<\/strong> <a href=\"https:\/\/altaintegra.com\/insight\/consultant-vs-design-build\/\">Consultant or Design-Builder: Which Risk Are You Least Willing to Carry?<\/a>, One route buys cost certainty. The other buys design quality. Complexity decides which you can afford to trade.<\/li>\n<\/ul>\n<p><!--\/alta-seo-block--><\/p>\n","protected":false},"featured_media":1338,"template":"","portfolio":[42],"discipline":[37],"strategic":[],"integration":[104],"subsector":[75],"class_list":["post-318","project","type-project","status-publish","has-post-thumbnail","hentry","portfolio-public-buildings-and-spaces","discipline-audiovisual-consultant","integration-conference-halls","subsector-convention-exhibition"],"acf":[],"_links":{"self":[{"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/projects\/318","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/types\/project"}],"version-history":[{"count":10,"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/projects\/318\/revisions"}],"predecessor-version":[{"id":2681,"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/projects\/318\/revisions\/2681"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/media\/1338"}],"wp:attachment":[{"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/media?parent=318"}],"wp:term":[{"taxonomy":"portfolio","embeddable":true,"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/portfolio?post=318"},{"taxonomy":"discipline","embeddable":true,"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/discipline?post=318"},{"taxonomy":"strategic","embeddable":true,"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/strategic?post=318"},{"taxonomy":"integration","embeddable":true,"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/integration?post=318"},{"taxonomy":"subsector","embeddable":true,"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/subsector?post=318"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}