{"id":35,"date":"2023-06-01T09:00:00","date_gmt":"2023-06-01T09:00:00","guid":{"rendered":"https:\/\/altaintegra.com\/projects\/harapan-kita-pediatric\/"},"modified":"2026-10-26T04:16:27","modified_gmt":"2026-10-26T04:16:27","slug":"harapan-kita-pediatric-cardiology-hospital","status":"publish","type":"project","link":"https:\/\/altaintegra.com\/vi\/project\/harapan-kita-pediatric-cardiology-hospital\/","title":{"rendered":"Pediatric Cardiology, RS Harapan Kita"},"content":{"rendered":"<p class=\"proj-p\">This is a corporate, education, and healthcare project completed in 2023 in Jakarta, ID, part of ALTA Integra&#8217;s Lighting Design portfolio.<\/p>\n<div id=\"rank-math-toc\" class=\"wp-block-rank-math-toc-block\">\n<h2>Table of Contents<\/h2>\n<nav>\n<ul>\n<li><a href=\"#project-overview\">Project Overview<\/a><\/li>\n<li><a href=\"#project-scope\">Harapan Kita Pediatric Cardiology Hospital, Engineering Scope<\/a><\/li>\n<li><a href=\"#project-details\">Harapan Kita Pediatric Cardiology Hospital, Project Details<\/a><\/li>\n<li><a href=\"#related-work\">Related Harapan Kita Pediatric Cardiology Work<\/a><\/li>\n<\/ul>\n<\/nav>\n<\/div>\n<h2 id=\"project-overview\" class=\"proj-h2\">Project Overview<\/h2>\n<p><!--alta-seo-block--><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/2023\/06\/harapan-kita-1.png\" alt=\"Pediatric Cardiology, RS Harapan Kita, harapan kita pediatric cardiology engineering by ALTA Integra\" loading=\"lazy\" title=\"\"><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/2023\/06\/harapankita1.webp\" alt=\"Pediatric Cardiology, RS Harapan Kita, harapan kita pediatric cardiology engineering by ALTA Integra (view 2)\" loading=\"lazy\" title=\"\"><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/2023\/06\/harapankita2.webp\" alt=\"Pediatric Cardiology, RS Harapan Kita, harapan kita pediatric cardiology engineering by ALTA Integra (view 3)\" loading=\"lazy\" title=\"\"><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/2023\/06\/harapan-kita-3.png\" alt=\"Pediatric Cardiology, RS Harapan Kita, harapan kita pediatric cardiology engineering by ALTA Integra (view 4)\" loading=\"lazy\" title=\"\"><br \/>\n<!--\/alta-seo-block--><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/2023\/06\/harapan-kita-1.png\" alt=\"Harapan Kita Pediatric Cardiology Hospital, Lighting Design by ALTA Integra\" title=\"\"><\/p>\n<p class=\"proj-p\">RS Harapan Kita, the National Cardiovascular Center Harapan Kita in West Jakarta, commissioned a lighting design for its pediatric cardiology ward, delivered in 2023 with architect Global Rancang Selaras. The brief moved away from a conventional clinical lighting scheme toward a boutique-hotel-inspired concept, treating the ward as a space where recovery, not just treatment, shapes the environment for young cardiac patients and their families.<\/p>\n<p class=\"proj-p\">ALTA Integra led the lighting design for the ward, working alongside Global Rancang Selaras to translate that hospitality-grade lighting language into a healthcare setting without compromising the clinical functions a cardiology ward requires. The scope was coordinated to support the project&#8217;s WELL Certification target, aligning lighting quality, a recognised factor in patient wellbeing, with the certification&#8217;s health-centered performance criteria.<\/p>\n<p class=\"proj-p\">The result is a paediatric ward where lighting is designed around recovery rather than institutional routine, softer, warmer, and more considered than the fluorescent-lit norm typical of hospital wards, inside a facility that treats some of the country&#8217;s most vulnerable young cardiac patients.<\/p>\n<h2 id=\"project-scope\" class=\"proj-h2\">Harapan Kita Pediatric Cardiology Hospital, Engineering Scope<\/h2>\n<p class=\"proj-p\"><a href=\"https:\/\/altaintegra.com\/services\/lighting-designer\/\">Lighting Design<\/a> work covers illuminance levels, colour temperature, and light layering, balancing visual comfort with the space&#8217;s architectural character. Fixture selection and control zoning are worked out alongside the electrical and interior design teams so the finished lighting reads as one coherent layer, not a collection of separate fittings.<\/p>\n<p class=\"proj-p\">Harapan Kita Pediatric Cardiology Hospital&#8217;s integration scope reflects ALTA Integra&#8217;s conference hall integration, covering AV, acoustics, and lighting for presentation and hybrid-meeting use.<\/p>\n<p class=\"proj-p\">As part of ALTA Integra&#8217;s Corporate, Education, and Healthcare portfolio, Harapan Kita Pediatric Cardiology Hospital sits among workplace, learning, and clinical environments, where comfort and speech clarity are day-to-day performance requirements, not one-off events.<\/p>\n<p class=\"proj-p\">ALTA Integra&#8217;s process on Harapan Kita Pediatric Cardiology Hospital followed its standard sequence: modelling the relevant engineering criteria before construction, then verifying the finished result against those same targets on site.<\/p>\n<p class=\"proj-p\">Harapan Kita Pediatric Cardiology Hospital falls within ALTA Integra&#8217;s Hospital Complex work, clinical environments where noise control affects patient rest and recovery as much as it affects everyday comfort.<\/p>\n<p class=\"proj-p\">Other Corporate, Education, and Healthcare projects in ALTA Integra&#8217;s portfolio include <a href=\"https:\/\/altaintegra.com\/project\/santo-ignatius-building-canisius-college\/\">Santo Ignatius Building Canisius College<\/a>, <a href=\"https:\/\/altaintegra.com\/project\/audiovisual-room-canisius-college\/\">Audiovisual Room Canisius College<\/a>.<\/p>\n<h2 id=\"project-details\" class=\"proj-h2\">Harapan Kita Pediatric Cardiology Hospital, Project Details<\/h2>\n<p class=\"proj-p\">Before handover, ALTA Integra&#8217;s standard practice is to walk the finished space against the original design brief for Harapan Kita Pediatric Cardiology Hospital, checking that installed equipment, room treatments, and control systems match what was specified, and flagging any adjustment needed before the space goes into daily use. This final verification step is treated as part of the project&#8217;s scope, not an optional add-on, since a design that only works on paper or in a simulation isn&#8217;t actually finished until it has been confirmed against the real, built result.<\/p>\n<p class=\"proj-p\">ALTA Integra documents every project like Harapan Kita Pediatric Cardiology Hospital the same way: real measured or modelled targets, the actual disciplines and taxonomy under which the work is filed, and the people and organizations involved, kept consistent across the portfolio so any project can be compared against another on the same terms rather than described in one-off marketing language. That consistency matters more once a portfolio spans dozens of projects across different sectors, without a shared documentation standard, a client-facing case study and an internal engineering record would quietly drift into two different tellings of the same project.<\/p>\n<p class=\"proj-p\">Projects the size of Harapan Kita Pediatric Cardiology Hospital also test how well a design holds up once it leaves the drawing board, a target reverberation time, an isolation figure, or a lighting level is only meaningful once it survives contact with the actual materials, contractors, and site conditions available on a real build, which is exactly why ALTA Integra treats the field-verification stage as equal in importance to the original design work rather than a formality that happens after the real work is done.<\/p>\n<p class=\"proj-p\">Every entry in ALTA Integra&#8217;s portfolio, including Harapan Kita Pediatric Cardiology Hospital, is tagged against the same fixed taxonomy of portfolio category, subsector, engineering discipline, and, where relevant, strategic focus and integration type, rather than a free-text description that would vary from one project write-up to the next. That consistent tagging is what lets a visitor filter the portfolio by sector or discipline and get a meaningful, comparable result instead of a loosely related grab-bag of past work.<\/p>\n<p class=\"proj-p\">It was delivered with client Global Rancang Selaras and owner RS Harapan Kita.<\/p>\n<p class=\"proj-p\">The project&#8217;s scope included engineering disciplines covering Lighting Design; integration scope across Conference Halls; strategic focus on WELL Certification.<\/p>\n<p class=\"proj-p\">It is located in Jakarta, ID, completed in 2023, classified under the Hospital Complex subsector and within ALTA Integra&#8217;s Corporate, Education, and Healthcare portfolio category.<\/p>\n<p class=\"proj-p\">This case study documents ALTA Integra&#8217;s lighting design approach for this project.<\/p>\n<p class=\"proj-p\">RSAB Harapan Kita is documented in Indonesia&#8217;s Ministry of Health <a href=\"https:\/\/rs.kemkes.go.id\/hospitals\/rs-anak-bunda-harapan-kita\" target=\"_blank\" rel=\"noopener\">hospital directory<\/a>.<\/p>\n<p><!--alta-seo-block--><\/p>\n<h2 id=\"related-work\" class=\"proj-h2\">Related Harapan Kita Pediatric Cardiology Work and Further Reading<\/h2>\n<p class=\"proj-p\">The Harapan Kita Pediatric Cardiology work on this project connects directly to the engineering below, other ALTA Integra projects in the same sector, and the technical insights explaining the methods used here.<\/p>\n<ul class=\"proj-related\">\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/rs-pik.jpg\" alt=\"Pantai Indah Kapuk Hospital, related harapan kita pediatric cardiology work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Project:<\/strong> <a href=\"https:\/\/altaintegra.com\/project\/pik-hospital\/\">Pantai Indah Kapuk Hospital<\/a>, Construction-noise barriers protecting an active hospital, predictive design, on-site measurement, eco-friendly materials.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/bank-of-america.jpg\" alt=\"Global Financial Services Office, related harapan kita pediatric cardiology work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Project:<\/strong> <a href=\"https:\/\/altaintegra.com\/project\/global-financial-services-office-jakarta\/\">Global Financial Services Office<\/a>, Global banking fitout, open-plan acoustic zoning, hybrid-ready meeting rooms, and biophilic lighting for a workforce focused on precision.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/jp-morgan-1-v2.jpg\" alt=\"Global Investment Bank Head Office, related harapan kita pediatric cardiology work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Project:<\/strong> <a href=\"https:\/\/altaintegra.com\/project\/global-investment-bank-jakarta-office\/\">Global Investment Bank Head Office<\/a>, Daylight integration with artificial lighting, sDA \/ ASE analysis, and LEED-grade acoustics, productivity without sterility.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/2026\/07\/01_download_png.webp\" alt=\"Upper-Room UVGI: How Germicidal UV Disinfects Air in Occupied Rooms, related harapan kita pediatric cardiology work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Insight:<\/strong> <a href=\"https:\/\/altaintegra.com\/insight\/upper-room-uvgi\/\">Upper-Room UVGI: How Germicidal UV Disinfects Air in Occupied Rooms<\/a>, The technology is eighty years old, the evidence is unusually good, and the standard governing it was published in 2023.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/2026\/07\/01_burnout-clerk_jpg.webp\" alt=\"Background Noise in Buildings: What It Costs in Productivity, Health and Speech Intelligibility, related harapan kita pediatric cardiology work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Insight:<\/strong> <a href=\"https:\/\/altaintegra.com\/insight\/background-noise-in-buildings\/\">Background Noise in Buildings: What It Costs in Productivity, Health and Speech Intelligibility<\/a>, The hum nobody notices is the one doing the damage, and the evidence on what it costs is more current than most project specifications reflect.<\/li>\n<\/ul>\n<p><!--\/alta-seo-block--><\/p>\n","protected":false},"featured_media":1056,"template":"","portfolio":[44],"discipline":[30],"strategic":[97],"integration":[104],"subsector":[71],"class_list":["post-35","project","type-project","status-publish","has-post-thumbnail","hentry","portfolio-corporate-education-and-healthcare","discipline-lighting-designer","strategic-well-certification","integration-conference-halls","subsector-hospital-complex"],"acf":[],"_links":{"self":[{"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/projects\/35","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/types\/project"}],"version-history":[{"count":12,"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/projects\/35\/revisions"}],"predecessor-version":[{"id":2685,"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/projects\/35\/revisions\/2685"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/media\/1056"}],"wp:attachment":[{"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/media?parent=35"}],"wp:term":[{"taxonomy":"portfolio","embeddable":true,"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/portfolio?post=35"},{"taxonomy":"discipline","embeddable":true,"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/discipline?post=35"},{"taxonomy":"strategic","embeddable":true,"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/strategic?post=35"},{"taxonomy":"integration","embeddable":true,"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/integration?post=35"},{"taxonomy":"subsector","embeddable":true,"href":"https:\/\/altaintegra.com\/vi\/wp-json\/wp\/v2\/subsector?post=35"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}