{"id":1407,"date":"2026-07-29T05:35:47","date_gmt":"2026-07-29T05:35:47","guid":{"rendered":"https:\/\/altaintegra.com\/?post_type=project&#038;p=1407"},"modified":"2026-08-24T17:05:21","modified_gmt":"2026-08-24T17:05:21","slug":"kino-tower","status":"publish","type":"project","link":"https:\/\/altaintegra.com\/zh\/project\/kino-tower\/","title":{"rendered":"Kino Tower"},"content":{"rendered":"<p class=\"proj-p\">This is a corporate, education, and healthcare project completed in 2017 in Jakarta, ID, part of ALTA Integra&#8217;s Acoustic Engineering portfolio.<\/p>\n<div id=\"rank-math-toc\" class=\"wp-block-rank-math-toc-block\">\n<h2>Table of Contents<\/h2>\n<nav>\n<ul>\n<li><a href=\"#project-overview\">Project Overview<\/a><\/li>\n<li><a href=\"#project-scope\">Kino Tower, Engineering Scope<\/a><\/li>\n<li><a href=\"#project-details\">Kino Tower, Project Details<\/a><\/li>\n<li><a href=\"#related-work\">Related Kino Tower Work<\/a><\/li>\n<\/ul>\n<\/nav>\n<\/div>\n<h2 id=\"project-overview\" class=\"proj-h2\">Project Overview<\/h2>\n<p><!--alta-seo-block--><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/kino-tower-1.webp\" alt=\"Kino Tower, Kino Tower engineering by ALTA Integra\" loading=\"lazy\" title=\"\"><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/kino-tower-2.webp\" alt=\"Kino Tower, Kino Tower engineering by ALTA Integra (view 2)\" loading=\"lazy\" title=\"\"><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/kino-tower-3.webp\" alt=\"Kino Tower, Kino Tower engineering by ALTA Integra (view 3)\" loading=\"lazy\" title=\"\"><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/kino-tower-4.webp\" alt=\"Kino Tower, Kino Tower engineering by ALTA Integra (view 4)\" loading=\"lazy\" title=\"\"><br \/>\n<!--\/alta-seo-block--><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/kino-tower-1.webp\" alt=\"Kino Tower, Acoustic Engineering by ALTA Integra\" title=\"\"><\/p>\n<p class=\"proj-p\">Kino Tower is a 27-storey Grade B office tower in Alam Sutera, Tangerang, completed in 2018 as the corporate headquarters of PT Kino Indonesia Tbk, a glass curtain-wall building with marble-finished interiors, whose podium mixes corporate floors with retail, a fitness centre, and the Black Swan Ballroom, a large public event venue. That programme put open offices, boardrooms, a public ballroom, and back-of-house plant into the same building, each with a different acoustic requirement. ALTA Integra worked as acoustic and audiovisual consultant alongside architect PT Arsita Interkreasi, main contractor PT Tatamulia Nusantara Indah, structural consultant PT Gistama Inti Semesta, and MEP consultant PT Metakom Pranata.<\/p>\n<p class=\"proj-p\">Acoustics was built into the design from the start rather than added afterward as panels: zoning separated focus work from collaboration and social areas, fa\u00e7ade detailing addressed traffic noise from the surrounding Alam Sutera area, and ceiling and material choices were coordinated to control reverberation. On the engineering side, the team worked with the MEP and structural consultants on HVAC noise, duct attenuation, equipment vibration isolation, elevator noise, and plant-room enclosure.<\/p>\n<p class=\"proj-p\">Different space types were held to different targets, STC and Rw for sound isolation, NC and RC for background noise, reverberation time for room acoustics, and Speech Transmission Index for meeting rooms and hybrid video-conferencing spaces, verified through acoustic modeling, simulation, and post-construction measurement rather than assumed from the drawings.<\/p>\n<p class=\"proj-p\">Kino Tower was engineered against established <a href=\"https:\/\/en.wikipedia.org\/wiki\/Architectural_acoustics\" target=\"_blank\" rel=\"noopener\">architectural acoustics<\/a> practice.<\/p>\n<h2 id=\"project-scope\" class=\"proj-h2\">Kino Tower, Engineering Scope<\/h2>\n<p class=\"proj-p\">ALTA Integra&#8217;s <a href=\"https:\/\/altaintegra.com\/services\/acoustic-consultant\/\">Acoustic Engineering<\/a> practice covers reverberation control, noise isolation, speech intelligibility, and room acoustic modelling, verified through on-site acoustic measurement. On a completed project, this typically means checking the finished space against the same targets used at the design stage, rather than treating acoustic modelling as a one-off design exercise.<\/p>\n<p class=\"proj-p\">As part of ALTA Integra&#8217;s Corporate, Education, and Healthcare portfolio, Kino Tower sits among workplace, learning, and clinical environments, where comfort and speech clarity are day-to-day performance requirements, not one-off events.<\/p>\n<p class=\"proj-p\">ALTA Integra&#8217;s process on Kino Tower followed its standard sequence: modelling the relevant engineering criteria before construction, then verifying the finished result against those same targets on site.<\/p>\n<p class=\"proj-p\">Kino Tower falls within ALTA Integra&#8217;s Office &amp;amp; Fit-Out work, workplace interiors where the engineering scope has to integrate cleanly into a finished, occupied fit-out.<\/p>\n<p class=\"proj-p\">Other Corporate, Education, and Healthcare projects in ALTA Integra&#8217;s portfolio include <a href=\"https:\/\/altaintegra.com\/project\/santo-ignatius-building-canisius-college\/\">Santo Ignatius Building Canisius College<\/a>, <a href=\"https:\/\/altaintegra.com\/project\/audiovisual-room-canisius-college\/\">Audiovisual Room Canisius College<\/a>.<\/p>\n<h2 id=\"project-details\" class=\"proj-h2\">Kino Tower, Project Details<\/h2>\n<p class=\"proj-p\">Before handover, ALTA Integra&#8217;s standard practice is to walk the finished space against the original design brief for Kino Tower, checking that installed equipment, room treatments, and control systems match what was specified, and flagging any adjustment needed before the space goes into daily use. This final verification step is treated as part of the project&#8217;s scope, not an optional add-on, since a design that only works on paper or in a simulation isn&#8217;t actually finished until it has been confirmed against the real, built result.<\/p>\n<p class=\"proj-p\">ALTA Integra documents every project like Kino Tower the same way: real measured or modelled targets, the actual disciplines and taxonomy under which the work is filed, and the people and organizations involved, kept consistent across the portfolio so any project can be compared against another on the same terms rather than described in one-off marketing language. That consistency matters more once a portfolio spans dozens of projects across different sectors, without a shared documentation standard, a client-facing case study and an internal engineering record would quietly drift into two different tellings of the same project.<\/p>\n<p class=\"proj-p\">Projects the size of Kino Tower also test how well a design holds up once it leaves the drawing board, a target reverberation time, an isolation figure, or a lighting level is only meaningful once it survives contact with the actual materials, contractors, and site conditions available on a real build, which is exactly why ALTA Integra treats the field-verification stage as equal in importance to the original design work rather than a formality that happens after the real work is done.<\/p>\n<p class=\"proj-p\">Every entry in ALTA Integra&#8217;s portfolio, including Kino Tower, is tagged against the same fixed taxonomy of portfolio category, subsector, engineering discipline, and, where relevant, strategic focus and integration type, rather than a free-text description that would vary from one project write-up to the next. That consistent tagging is what lets a visitor filter the portfolio by sector or discipline and get a meaningful, comparable result instead of a loosely related grab-bag of past work.<\/p>\n<p class=\"proj-p\">The project&#8217;s scope included engineering disciplines covering Acoustic Engineering.<\/p>\n<p class=\"proj-p\">It is located in Jakarta, ID, completed in 2017, classified under the Office &amp;amp; Fit-Out subsector and within ALTA Integra&#8217;s Corporate, Education, and Healthcare portfolio category.<\/p>\n<p class=\"proj-p\">This case study documents ALTA Integra&#8217;s acoustic engineering approach for this project.<\/p>\n<p><!--alta-seo-block--><\/p>\n<h2 id=\"related-work\" class=\"proj-h2\">Related Kino Tower Work and Further Reading<\/h2>\n<p class=\"proj-p\">The Kino Tower work on this project connects directly to the engineering below, other ALTA Integra projects in the same sector, and the technical insights explaining the methods used here.<\/p>\n<ul class=\"proj-related\">\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/nusantara-tv.png\" alt=\"Nusantara TV Tower, related Kino Tower work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Project:<\/strong> <a href=\"https:\/\/altaintegra.com\/project\/nt-tower-jakarta\/\">Nusantara TV Tower<\/a>, Acoustic, lighting, and audiovisual design across the Nusantara TV Tower, daily news production, talk-shows, and live-to-air specials share the building with corporate offices, an auditorium, and\u2026<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/bank-of-america.jpg\" alt=\"Global Financial Services Office, related Kino Tower work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Project:<\/strong> <a href=\"https:\/\/altaintegra.com\/project\/global-financial-services-office-jakarta\/\">Global Financial Services Office<\/a>, Global banking fitout, open-plan acoustic zoning, hybrid-ready meeting rooms, and biophilic lighting for a workforce focused on precision.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/astra-zeneca-6.webp\" alt=\"Pharmaceuticals Research Head Office, related Kino Tower work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Project:<\/strong> <a href=\"https:\/\/altaintegra.com\/project\/pharmaceutical-research-office-jakarta\/\">Pharmaceuticals Research Head Office<\/a>, Pharma-grade collaboration studio with acoustic design for global town-halls.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/2026\/07\/01_7_jpg.webp\" alt=\"Acoustic Design Consultation Services, related Kino Tower work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Insight:<\/strong> <a href=\"https:\/\/altaintegra.com\/insight\/acoustic-design-consultation-services\/\">Acoustic Design Consultation Services<\/a>, ALTA Integra provides acoustic design consultation for architectural, industrial, and transportation noise, from planning through construction testing.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/2026\/07\/01_konsultasi-hvac-02_jpg.webp\" alt=\"HVAC Noise Above 55 dBA in an Open-Plan Office: A Modelling-Led Fix, related Kino Tower work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Insight:<\/strong> <a href=\"https:\/\/altaintegra.com\/insight\/open-plan-office-hvac-noise-control\/\">HVAC Noise Above 55 dBA in an Open-Plan Office: A Modelling-Led Fix<\/a>, A ceiling-less open plan, a semi-central system, and ducting noise nobody could locate by ear.<\/li>\n<\/ul>\n<p><!--\/alta-seo-block--><\/p>\n","protected":false},"featured_media":1408,"template":"","portfolio":[44],"discipline":[28],"strategic":[],"integration":[],"subsector":[69],"class_list":["post-1407","project","type-project","status-publish","has-post-thumbnail","hentry","portfolio-corporate-education-and-healthcare","discipline-acoustic-consultant","subsector-office-fit-out"],"acf":[],"_links":{"self":[{"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/projects\/1407","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/types\/project"}],"version-history":[{"count":7,"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/projects\/1407\/revisions"}],"predecessor-version":[{"id":2105,"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/projects\/1407\/revisions\/2105"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/media\/1408"}],"wp:attachment":[{"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/media?parent=1407"}],"wp:term":[{"taxonomy":"portfolio","embeddable":true,"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/portfolio?post=1407"},{"taxonomy":"discipline","embeddable":true,"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/discipline?post=1407"},{"taxonomy":"strategic","embeddable":true,"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/strategic?post=1407"},{"taxonomy":"integration","embeddable":true,"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/integration?post=1407"},{"taxonomy":"subsector","embeddable":true,"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/subsector?post=1407"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}