{"id":276,"date":"2026-06-22T11:33:21","date_gmt":"2026-06-22T11:33:21","guid":{"rendered":"https:\/\/altaintegra.com\/projects\/pik-hospital\/"},"modified":"2026-08-24T17:05:43","modified_gmt":"2026-08-24T17:05:43","slug":"pik-hospital","status":"publish","type":"project","link":"https:\/\/altaintegra.com\/zh\/project\/pik-hospital\/","title":{"rendered":"Pantai Indah Kapuk Hospital"},"content":{"rendered":"<p class=\"proj-p\">This is a construction and industry project completed in 2025 in Jakarta, ID, part of ALTA Integra&#8217;s Acoustic Engineering portfolio.<\/p>\n<div id=\"rank-math-toc\" class=\"wp-block-rank-math-toc-block\">\n<h2>Table of Contents<\/h2>\n<nav>\n<ul>\n<li><a href=\"#project-overview\">Project Overview<\/a><\/li>\n<li><a href=\"#project-scope\">PIK Hospital, Engineering Scope<\/a><\/li>\n<li><a href=\"#project-details\">PIK Hospital, Project Details<\/a><\/li>\n<li><a href=\"#related-work\">Related Hospital Work<\/a><\/li>\n<\/ul>\n<\/nav>\n<\/div>\n<h2 id=\"project-overview\" class=\"proj-h2\">Project Overview<\/h2>\n<p><!--alta-seo-block--><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/rs-pik.jpg\" alt=\"Pantai Indah Kapuk Hospital, hospital engineering by ALTA Integra\" loading=\"lazy\" title=\"\"><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/rs-pik-2.jpg\" alt=\"Pantai Indah Kapuk Hospital, hospital engineering by ALTA Integra (view 2)\" loading=\"lazy\" title=\"\"><br \/>\n<!--\/alta-seo-block--><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/rs-pik-2.jpg\" alt=\"PIK Hospital, Acoustic Engineering by ALTA Integra\" title=\"\"><\/p>\n<p class=\"proj-p\">Pantai Indah Kapuk Hospital, a mother-and-child hospital (RS Ibu dan Anak PIK), needed to stay in operation through nearby construction work, a parking-facility demolition, without the noise disrupting patient care. ALTA Integra designed the noise barriers to make that possible.<\/p>\n<p class=\"proj-p\">The team started by identifying and measuring each construction activity&#8217;s noise output, concrete cutting at 105.7 dBA at source, jack hammering, pile driving, and general works averaging around 85 dBA, then built noise models mapping how that noise would propagate to the hospital fa\u00e7ade from different work positions and distances, predicting fa\u00e7ade levels in roughly the 60\u201370 dBA range depending on proximity.<\/p>\n<p class=\"proj-p\">Several noise-barrier concepts were then tested to find the best acoustic performance at the lowest cost: permanent and portable barriers for the loudest, closest work such as jack hammering and concrete cutting, built from materials selected for lower environmental impact, with the facades exposed to higher noise levels oriented toward non-sensitive spaces such as circulation areas and storage rather than patient rooms.<\/p>\n<p class=\"proj-p\">Before installation, ALTA Integra reviewed the winning contractor&#8217;s noise-barrier mock-up materials against the design. Once the barriers were in place, construction proceeded without disrupting the hospital&#8217;s healthcare services.<\/p>\n<p class=\"proj-p\">PIK Hospital was engineered against established <a href=\"https:\/\/en.wikipedia.org\/wiki\/Architectural_acoustics\" target=\"_blank\" rel=\"noopener\">architectural acoustics<\/a> practice.<\/p>\n<h2 id=\"project-scope\" class=\"proj-h2\">PIK Hospital, Engineering Scope<\/h2>\n<p class=\"proj-p\">ALTA Integra&#8217;s <a href=\"https:\/\/altaintegra.com\/services\/acoustic-consultant\/\">Acoustic Engineering<\/a> practice covers reverberation control, noise isolation, speech intelligibility, and room acoustic modelling, verified through on-site acoustic measurement. On a completed project, this typically means checking the finished space against the same targets used at the design stage, rather than treating acoustic modelling as a one-off design exercise.<\/p>\n<p class=\"proj-p\">PIK Hospital&#8217;s integration scope reflects ALTA Integra&#8217;s conference hall integration, covering AV, acoustics, and lighting for presentation and hybrid-meeting use.<\/p>\n<p class=\"proj-p\">As part of ALTA Integra&#8217;s Construction and Industry portfolio, PIK Hospital sits among industrial and processing facilities, where noise control and building performance intersect with operational requirements.<\/p>\n<p class=\"proj-p\">ALTA Integra&#8217;s process on PIK Hospital followed its standard sequence: modelling the relevant engineering criteria before construction, then verifying the finished result against those same targets on site.<\/p>\n<p class=\"proj-p\">PIK Hospital falls within ALTA Integra&#8217;s Construction work, an active construction environment, where noise and vibration control has to be planned around a build schedule rather than a finished, occupied space.<\/p>\n<p class=\"proj-p\">PIK Hospital falls within ALTA Integra&#8217;s Hospital Complex work, clinical environments where noise control affects patient rest and recovery as much as it affects everyday comfort.<\/p>\n<p class=\"proj-p\">Other Construction and Industry projects in ALTA Integra&#8217;s portfolio include <a href=\"https:\/\/altaintegra.com\/project\/pertamina-gas-palembang\/\">Pertamina Gas Palembang<\/a>, <a href=\"https:\/\/altaintegra.com\/project\/bt-cocoa-warehouse-facility\/\">BT Cocoa Warehouse Facility<\/a>.<\/p>\n<h2 id=\"project-details\" class=\"proj-h2\">PIK Hospital, Project Details<\/h2>\n<p class=\"proj-p\">Before handover, ALTA Integra&#8217;s standard practice is to walk the finished space against the original design brief for PIK Hospital, checking that installed equipment, room treatments, and control systems match what was specified, and flagging any adjustment needed before the space goes into daily use. This final verification step is treated as part of the project&#8217;s scope, not an optional add-on, since a design that only works on paper or in a simulation isn&#8217;t actually finished until it has been confirmed against the real, built result.<\/p>\n<p class=\"proj-p\">ALTA Integra documents every project like PIK Hospital the same way: real measured or modelled targets, the actual disciplines and taxonomy under which the work is filed, and the people and organizations involved, kept consistent across the portfolio so any project can be compared against another on the same terms rather than described in one-off marketing language. That consistency matters more once a portfolio spans dozens of projects across different sectors, without a shared documentation standard, a client-facing case study and an internal engineering record would quietly drift into two different tellings of the same project.<\/p>\n<p class=\"proj-p\">Projects the size of PIK Hospital also test how well a design holds up once it leaves the drawing board, a target reverberation time, an isolation figure, or a lighting level is only meaningful once it survives contact with the actual materials, contractors, and site conditions available on a real build, which is exactly why ALTA Integra treats the field-verification stage as equal in importance to the original design work rather than a formality that happens after the real work is done.<\/p>\n<p class=\"proj-p\">Every entry in ALTA Integra&#8217;s portfolio, including PIK Hospital, is tagged against the same fixed taxonomy of portfolio category, subsector, engineering discipline, and, where relevant, strategic focus and integration type, rather than a free-text description that would vary from one project write-up to the next. That consistent tagging is what lets a visitor filter the portfolio by sector or discipline and get a meaningful, comparable result instead of a loosely related grab-bag of past work.<\/p>\n<p class=\"proj-p\">It was delivered with client PIK Group.<\/p>\n<p class=\"proj-p\">The project&#8217;s scope included engineering disciplines covering Acoustic Engineering; integration scope across Conference Halls; strategic focus on WELL Certification.<\/p>\n<p class=\"proj-p\">It is located in Jakarta, ID, completed in 2025, classified under the Construction subsector and within ALTA Integra&#8217;s Construction and Industry portfolio category.<\/p>\n<p class=\"proj-p\">This case study documents ALTA Integra&#8217;s acoustic engineering approach for this project.<\/p>\n<p><!--alta-seo-block--><\/p>\n<h2 id=\"related-work\" class=\"proj-h2\">Related Hospital Work and Further Reading<\/h2>\n<p class=\"proj-p\">The Hospital work on this project connects directly to the engineering below, other ALTA Integra projects in the same sector, and the technical insights explaining the methods used here.<\/p>\n<ul class=\"proj-related\">\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/2023\/06\/harapan-kita-1.png\" alt=\"Pediatric Cardiology, RS Harapan Kita, related hospital work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Project:<\/strong> <a href=\"https:\/\/altaintegra.com\/project\/harapan-kita-pediatric-cardiology-hospital\/\">Pediatric Cardiology, RS Harapan Kita<\/a>, Boutique-hotel-inspired lighting concept for paediatric cardiology, a hospital ward designed to accelerate recovery.<\/li>\n<li><strong>Project:<\/strong> <a href=\"https:\/\/altaintegra.com\/project\/pertamina-gas-palembang\/\">Pertamina Gas, Palembang Processing Facility<\/a>, Environmental and occupational noise assessment for a natural gas processing facility in South Sumatra, measured, modelled, and mitigated to Indonesian regulatory standards.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/bt-cocoa-1.webp\" alt=\"BT Cocoa, Processing Warehouse Facility, related hospital work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Project:<\/strong> <a href=\"https:\/\/altaintegra.com\/project\/bt-cocoa-warehouse-facility\/\">BT Cocoa, Processing Warehouse Facility<\/a>, Occupational noise and industrial acoustic design for one of Indonesia\u2019s largest cocoa processing facilities, a factory environment engineered for productivity and worker health.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/2026\/07\/01_7_jpg.webp\" alt=\"Acoustic Design Consultation Services, related hospital work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Insight:<\/strong> <a href=\"https:\/\/altaintegra.com\/insight\/acoustic-design-consultation-services\/\">Acoustic Design Consultation Services<\/a>, ALTA Integra provides acoustic design consultation for architectural, industrial, and transportation noise, from planning through construction testing.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/2026\/07\/01_download_png.webp\" alt=\"Upper-Room UVGI: How Germicidal UV Disinfects Air in Occupied Rooms, related hospital work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Insight:<\/strong> <a href=\"https:\/\/altaintegra.com\/insight\/upper-room-uvgi\/\">Upper-Room UVGI: How Germicidal UV Disinfects Air in Occupied Rooms<\/a>, The technology is eighty years old, the evidence is unusually good, and the standard governing it was published in 2023.<\/li>\n<\/ul>\n<p><!--\/alta-seo-block--><\/p>\n","protected":false},"featured_media":1356,"template":"","portfolio":[41,44],"discipline":[28],"strategic":[97],"integration":[104],"subsector":[86,71],"class_list":["post-276","project","type-project","status-publish","has-post-thumbnail","hentry","portfolio-construction-and-industry","portfolio-corporate-education-and-healthcare","discipline-acoustic-consultant","strategic-well-certification","integration-conference-halls","subsector-construction","subsector-hospital-complex"],"acf":[],"_links":{"self":[{"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/projects\/276","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/types\/project"}],"version-history":[{"count":9,"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/projects\/276\/revisions"}],"predecessor-version":[{"id":2129,"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/projects\/276\/revisions\/2129"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/media\/1356"}],"wp:attachment":[{"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/media?parent=276"}],"wp:term":[{"taxonomy":"portfolio","embeddable":true,"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/portfolio?post=276"},{"taxonomy":"discipline","embeddable":true,"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/discipline?post=276"},{"taxonomy":"strategic","embeddable":true,"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/strategic?post=276"},{"taxonomy":"integration","embeddable":true,"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/integration?post=276"},{"taxonomy":"subsector","embeddable":true,"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/subsector?post=276"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}