{"id":30,"date":"2024-06-01T09:00:00","date_gmt":"2024-06-01T09:00:00","guid":{"rendered":"https:\/\/altaintegra.com\/projects\/dbs-capital-place\/"},"modified":"2026-10-26T04:16:35","modified_gmt":"2026-10-26T04:16:35","slug":"dbs-capital-place","status":"publish","type":"project","link":"https:\/\/altaintegra.com\/zh\/project\/dbs-capital-place\/","title":{"rendered":"DBS Bank, Capital Place Jakarta"},"content":{"rendered":"<p class=\"proj-p\">This is a corporate, education, and healthcare project completed in 2020 in Jakarta, ID, part of ALTA Integra&#8217;s Acoustic Engineering and Audiovisual portfolio.<\/p>\n<div id=\"rank-math-toc\" class=\"wp-block-rank-math-toc-block\">\n<h2>Table of Contents<\/h2>\n<nav>\n<ul>\n<li><a href=\"#project-overview\">Project Overview<\/a><\/li>\n<li><a href=\"#project-scope\">DBS Capital Place, Engineering Scope<\/a><\/li>\n<li><a href=\"#project-details\">DBS Capital Place, Project Details<\/a><\/li>\n<li><a href=\"#related-work\">Related Capital Place Work<\/a><\/li>\n<\/ul>\n<\/nav>\n<\/div>\n<h2 id=\"project-overview\" class=\"proj-h2\">Project Overview<\/h2>\n<p><!--alta-seo-block--><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/dbs-bank-6.webp\" alt=\"DBS Bank, Capital Place Jakarta, capital place engineering by ALTA Integra\" loading=\"lazy\" title=\"\"><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/dbs-bank-9.webp\" alt=\"DBS Bank, Capital Place Jakarta, capital place engineering by ALTA Integra (view 2)\" loading=\"lazy\" title=\"\"><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/dbs-bank-7.webp\" alt=\"DBS Bank, Capital Place Jakarta, capital place engineering by ALTA Integra (view 3)\" loading=\"lazy\" title=\"\"><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/dbs-bank-8.webp\" alt=\"DBS Bank, Capital Place Jakarta, capital place engineering by ALTA Integra (view 4)\" loading=\"lazy\" title=\"\"><br \/>\n<!--\/alta-seo-block--><br \/>\n<img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/dbs-bank-2.jpg\" alt=\"DBS Capital Place, Acoustic Engineering by ALTA Integra\" title=\"\"><\/p>\n<p class=\"proj-p\">ALTA Integra delivered the acoustic and audiovisual design for DBS Bank&#8217;s new fit-out office at Capital Place, Jakarta, working alongside interior designers M Moser Singapore and CDA International. The acoustic scope started at building-shell level: reviewing existing MEP noise, facade performance, and outdoor noise intrusion, then running final measurement to verify acoustic performance against Green Mark v2 Platinum certification requirements.<\/p>\n<p class=\"proj-p\">In the open-plan office, the team set an acoustic zoning plan to cut distraction and protect speech privacy, in line with Green Mark&#8217;s acoustic criteria. Boardrooms, meeting rooms, and huddle spaces were designed around Cisco Webex Telepresence, balancing visual layout and ergonomics against the acoustic privacy and speech clarity a video conference room actually needs. The town hall was built for flexibility, able to expand by opening a high-STC operable wall shared with an adjoining meeting room\/music studio, distributing Cisco Webex video conferencing across the space through a Crestron audio system and a high-definition projector on a motorized lift.<\/p>\n<p class=\"proj-p\">For the boardroom&#8217;s video conferencing specifically, ALTA Integra ran computerized acoustic modeling and prediction, background noise, sound insulation\/wall STC ratings, and reverberation time, ahead of construction, then commissioned the space to confirm Cisco Webex audio quality held up in practice.<\/p>\n<p class=\"proj-p\">Client: <a href=\"https:\/\/www.dbs.com\" target=\"_blank\" rel=\"noopener\">M Moser \u00b7 CDA International<\/a>.<\/p>\n<h2 id=\"project-scope\" class=\"proj-h2\">DBS Capital Place, Engineering Scope<\/h2>\n<p class=\"proj-p\">ALTA Integra&#8217;s <a href=\"https:\/\/altaintegra.com\/services\/acoustic-consultant\/\">Acoustic Engineering<\/a> practice covers reverberation control, noise isolation, speech intelligibility, and room acoustic modelling, verified through on-site acoustic measurement. On a completed project, this typically means checking the finished space against the same targets used at the design stage, rather than treating acoustic modelling as a one-off design exercise.<\/p>\n<p class=\"proj-p\">The <a href=\"https:\/\/altaintegra.com\/services\/audiovisual-consultant\/\">Audiovisual<\/a> discipline covers sound reinforcement, video and display integration, and control-system design, coordinated alongside the acoustic and lighting scope. Equipment selection and signal routing are planned early enough that AV racks, cabling, and control points can be built into the architecture rather than retrofitted.<\/p>\n<p class=\"proj-p\">DBS Capital Place&#8217;s integration scope reflects ALTA Integra&#8217;s conference hall integration, covering AV, acoustics, and lighting for presentation and hybrid-meeting use.<\/p>\n<p class=\"proj-p\">As part of ALTA Integra&#8217;s Corporate, Education, and Healthcare portfolio, DBS Capital Place sits among workplace, learning, and clinical environments, where comfort and speech clarity are day-to-day performance requirements, not one-off events.<\/p>\n<p class=\"proj-p\">ALTA Integra&#8217;s process on DBS Capital Place followed its standard sequence: coordinating Acoustic Engineering and Audiovisual as a single scope rather than 2 separate hand-offs; modelling the relevant engineering criteria before construction, then verifying the finished result against those same targets on site.<\/p>\n<p class=\"proj-p\">DBS Capital Place falls within ALTA Integra&#8217;s Office &amp;amp; Fit-Out work, workplace interiors where the engineering scope has to integrate cleanly into a finished, occupied fit-out.<\/p>\n<p class=\"proj-p\">Other Corporate, Education, and Healthcare projects in ALTA Integra&#8217;s portfolio include <a href=\"https:\/\/altaintegra.com\/project\/santo-ignatius-building-canisius-college\/\">Santo Ignatius Building Canisius College<\/a>, <a href=\"https:\/\/altaintegra.com\/project\/audiovisual-room-canisius-college\/\">Audiovisual Room Canisius College<\/a>.<\/p>\n<h2 id=\"project-details\" class=\"proj-h2\">DBS Capital Place, Project Details<\/h2>\n<p class=\"proj-p\">Before handover, ALTA Integra&#8217;s standard practice is to walk the finished space against the original design brief for DBS Capital Place, checking that installed equipment, room treatments, and control systems match what was specified, and flagging any adjustment needed before the space goes into daily use. This final verification step is treated as part of the project&#8217;s scope, not an optional add-on, since a design that only works on paper or in a simulation isn&#8217;t actually finished until it has been confirmed against the real, built result.<\/p>\n<p class=\"proj-p\">ALTA Integra documents every project like DBS Capital Place the same way: real measured or modelled targets, the actual disciplines and taxonomy under which the work is filed, and the people and organizations involved, kept consistent across the portfolio so any project can be compared against another on the same terms rather than described in one-off marketing language. That consistency matters more once a portfolio spans dozens of projects across different sectors, without a shared documentation standard, a client-facing case study and an internal engineering record would quietly drift into two different tellings of the same project.<\/p>\n<p class=\"proj-p\">Projects the size of DBS Capital Place also test how well a design holds up once it leaves the drawing board, a target reverberation time, an isolation figure, or a lighting level is only meaningful once it survives contact with the actual materials, contractors, and site conditions available on a real build, which is exactly why ALTA Integra treats the field-verification stage as equal in importance to the original design work rather than a formality that happens after the real work is done.<\/p>\n<p class=\"proj-p\">Every entry in ALTA Integra&#8217;s portfolio, including DBS Capital Place, is tagged against the same fixed taxonomy of portfolio category, subsector, engineering discipline, and, where relevant, strategic focus and integration type, rather than a free-text description that would vary from one project write-up to the next. That consistent tagging is what lets a visitor filter the portfolio by sector or discipline and get a meaningful, comparable result instead of a loosely related grab-bag of past work.<\/p>\n<p class=\"proj-p\">It was delivered with client M Moser \u00b7 CDA International, owner DBS Bank and architect M Moser.<\/p>\n<p class=\"proj-p\">The project&#8217;s scope included engineering disciplines covering Acoustic Engineering and Audiovisual; integration scope across Conference Halls; strategic focus on WELL Certification.<\/p>\n<p class=\"proj-p\">It is located in Jakarta, ID, completed in 2020, classified under the Office &amp;amp; Fit-Out subsector and within ALTA Integra&#8217;s Corporate, Education, and Healthcare portfolio category.<\/p>\n<p class=\"proj-p\">This case study documents ALTA Integra&#8217;s acoustic engineering approach for this project.<\/p>\n<p><!--alta-seo-block--><\/p>\n<h2 id=\"related-work\" class=\"proj-h2\">Related Capital Place Work and Further Reading<\/h2>\n<p class=\"proj-p\">The Capital Place work on this project connects directly to the engineering below, other ALTA Integra projects in the same sector, and the technical insights explaining the methods used here.<\/p>\n<ul class=\"proj-related\">\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/bank-of-america.jpg\" alt=\"Global Financial Services Office, related capital place work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Project:<\/strong> <a href=\"https:\/\/altaintegra.com\/project\/global-financial-services-office-jakarta\/\">Global Financial Services Office<\/a>, Global banking fitout, open-plan acoustic zoning, hybrid-ready meeting rooms, and biophilic lighting for a workforce focused on precision.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/nokia.jpg\" alt=\"Nokia HQ, Capital Place Jakarta, related capital place work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Project:<\/strong> <a href=\"https:\/\/altaintegra.com\/project\/nokia-headquarter-capital-place-jakarta\/\">Nokia HQ, Capital Place Jakarta<\/a>, Audiovisual integration for a global headquarters that hosts engineering workshops on a daily basis.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/jp-morgan-1-v2.jpg\" alt=\"Global Investment Bank Head Office, related capital place work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Project:<\/strong> <a href=\"https:\/\/altaintegra.com\/project\/global-investment-bank-jakarta-office\/\">Global Investment Bank Head Office<\/a>, Daylight integration with artificial lighting, sDA \/ ASE analysis, and LEED-grade acoustics, productivity without sterility.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/mandiri-university.jpg\" alt=\"ALTA Integra Wins the Mandiri University Design Competition for Acoustics, Lighting and AV, related capital place work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Insight:<\/strong> <a href=\"https:\/\/altaintegra.com\/insight\/mandiri-university-design-competition\/\">ALTA Integra Wins the Mandiri University Design Competition for Acoustics, Lighting and AV<\/a>, Three disciplines awarded to one consultant on a single campus, against bidders from Singapore and Indonesia&#8217;s larger firms.<\/li>\n<li><img decoding=\"async\" src=\"https:\/\/altaintegra.com\/wp-content\/uploads\/2026\/07\/01_konsultasi-hvac-02_jpg.webp\" alt=\"HVAC Noise Above 55 dBA in an Open-Plan Office: A Modelling-Led Fix, related capital place work by ALTA Integra\" loading=\"lazy\" title=\"\"> <strong>Insight:<\/strong> <a href=\"https:\/\/altaintegra.com\/insight\/open-plan-office-hvac-noise-control\/\">HVAC Noise Above 55 dBA in an Open-Plan Office: A Modelling-Led Fix<\/a>, A ceiling-less open plan, a semi-central system, and ducting noise nobody could locate by ear.<\/li>\n<\/ul>\n<p><!--\/alta-seo-block--><\/p>\n","protected":false},"featured_media":1233,"template":"","portfolio":[44],"discipline":[28,37],"strategic":[97],"integration":[104],"subsector":[69],"class_list":["post-30","project","type-project","status-publish","has-post-thumbnail","hentry","portfolio-corporate-education-and-healthcare","discipline-acoustic-consultant","discipline-audiovisual-consultant","strategic-well-certification","integration-conference-halls","subsector-office-fit-out"],"acf":[],"_links":{"self":[{"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/projects\/30","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/types\/project"}],"version-history":[{"count":9,"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/projects\/30\/revisions"}],"predecessor-version":[{"id":2683,"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/projects\/30\/revisions\/2683"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/media\/1233"}],"wp:attachment":[{"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/media?parent=30"}],"wp:term":[{"taxonomy":"portfolio","embeddable":true,"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/portfolio?post=30"},{"taxonomy":"discipline","embeddable":true,"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/discipline?post=30"},{"taxonomy":"strategic","embeddable":true,"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/strategic?post=30"},{"taxonomy":"integration","embeddable":true,"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/integration?post=30"},{"taxonomy":"subsector","embeddable":true,"href":"https:\/\/altaintegra.com\/zh\/wp-json\/wp\/v2\/subsector?post=30"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}