Home » Portfolios » Media Production » ALTA INTEGRA ACOUSTIC CONSULTANT ON MOVIE STUDIO

ALTA INTEGRA ACOUSTIC CONSULTANT ON MOVIE STUDIO

MOVIE STUDIO

I Studio is a movie studio founded by Infinte Frameworks Group under the leadership of Mike Wiluan. Inaugurated on November 7, 2011 by the Minister of Tourism and Economy Mari Elka Pangestu. which is located in Nongsa, Batam archipelago with a land area of ​​ten hectares. The choice of Batam as the location for the movie studio is due to its strategic location for film producers in Singapore and Malaysia.

Project Highlight

One of the requirements set for this is the achievement of the NC-25 noise criteria. To achieve NC-25, we carried out several studies starting from observing environmental noise, observing building construction and materials to be installed. In addition, we also expect the reverberation on the indoor stage to be under 1.5 seconds. We perform Acoustic Modeling simulations to predict the reverberations that will occur in the room.
After the studio construction was completed, we measured background noise in the indoor stage and measured Reverberation Time (RT60). The measurement results show quite good results. With the results of these measurements, it is hoped that the acoustics of this studio will provide maximum results in order to support the production of local and foreign films. And of course this movie studio can also provide income for the nongsa region.

Premium Experience

The design and development planning of I Studio was carried out by a company led by a chief consultant from the UK. The main contractor for the indoor stage construction was carried out by PKP Indonesia, led by Mr. Fransiskus Sujono. ALTA Integra was appointed as an acoustic consultant to provide input and measure acoustic performance on the indoor stage.

Comfort and Wellness

Status

Complete

Area

Completion Date

Location

Batam

Photographer

Share this project

Related Work

Expertise
Project
Perspective

Follow @altaintegra